{"id":11416,"date":"2013-04-03T11:00:13","date_gmt":"2013-04-03T10:00:13","guid":{"rendered":"http:\/\/energia.eiffage.es\/en\/?p=11416"},"modified":"2013-04-03T11:00:13","modified_gmt":"2013-04-03T10:00:13","slug":"interconexion-electrica-entre-espana-y-francia","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/","title":{"rendered":"Involved in strengthening for electrical interconnection between Spain and France"},"content":{"rendered":"<p>Eiffage Energia has been awarded by Prysmian a large part of the project which REE (Electrical Network of Spain) and R\u00e9seau de Transport d&#8217;Electricit\u00e9 (RTE) are developing to increase the power exchange capacity between Spain and France.<\/p>\n<p>This project pretends to increase power exchange from 3 to 6% of maximal Peninsula power, strengthening the security of the two electrical systems and promote the integration of a greater volume of renewable energy, especially energy from Iberian wind system. Also, ensure the power supply in the province of Girona and future high-speed rail.<\/p>\n<p>This interconnection is declared a project of European interest and has funding of \u20ac 225 million under the European program EEPR (European Energy Program for Recovery). Network is a complex and exceptional infrastructure which represents one of the biggest challenges the company in the coming years. This line will be the first European network interconnection that is placed in service for nearly 30 years.<\/p>\n<p>The main Work features of this project are:<\/p>\n<ul>\n<li>400 kV High Voltage line which will increase the exchange capacity of 1,400 to 2,800 megawatts.<\/li>\n<li>The 65-kilometer High Voltage line will go underground and in layout we use existing infrastructure where possible.<\/li>\n<li>The line will connect with two converter substations: Santa Llogaia (Spain) and Baixas (France) through La Junquera in the eastern Pyrenees. These stations are required as a result of the line is a direct current line.<\/li>\n<li>The chosen technologies are an innovation by the length of the ground line, cable technology and converter stations to these voltage and power level.<\/li>\n<li>The works of interconnection through the Massif des Alberes begin in 2012 and will last approximately one year. Two tunneling machines will be used, which will begin work simultaneously on both sides of the border.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Eiffage Energia has been awarded by Prysmian a large part of the project which REE (Electrical Network of Spain) and R\u00e9seau de Transport d&#8217;Electricit\u00e9 (RTE) are developing to increase the power exchange capacity between Spain and France. This project pretends to increase power exchange from 3 to 6% of maximal Peninsula power, strengthening the security &#8230; <a title=\"Involved in strengthening for electrical interconnection between Spain and France\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/\" aria-label=\"Read more about Involved in strengthening for electrical interconnection between Spain and France\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":9120,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1333],"tags":[],"class_list":["post-11416","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"og:description\" content=\"Eiffage Energia has been awarded by Prysmian a large part of the project which REE (Electrical Network of Spain) and R\u00e9seau de Transport d&#8217;Electricit\u00e9 (RTE) are developing to increase the power exchange capacity between Spain and France. This project pretends to increase power exchange from 3 to 6% of maximal Peninsula power, strengthening the security ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2013-04-03T10:00:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\n\t<meta property=\"og:image:height\" content=\"868\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Eiffage Energia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/\"},\"author\":{\"name\":\"Eiffage Energia\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/cf9c666f5eb3c12fba3b18aeb5edf4ec\"},\"headline\":\"Involved in strengthening for electrical interconnection between Spain and France\",\"datePublished\":\"2013-04-03T10:00:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/\"},\"wordCount\":294,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/france-tunnel-entry-eiffage-energia.jpg\",\"articleSection\":[\"Eiffage Energ\u00eda\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/\",\"name\":\"Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/france-tunnel-entry-eiffage-energia.jpg\",\"datePublished\":\"2013-04-03T10:00:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/france-tunnel-entry-eiffage-energia.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/france-tunnel-entry-eiffage-energia.jpg\",\"width\":1300,\"height\":868},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2013\\\/04\\\/03\\\/interconexion-electrica-entre-espana-y-francia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Involved in strengthening for electrical interconnection between Spain and France\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/cf9c666f5eb3c12fba3b18aeb5edf4ec\",\"name\":\"Eiffage Energia\",\"sameAs\":[\"http:\\\/\\\/www.dev.energia.eiffage.es\"],\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/eiffage-energia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/","og_locale":"en_US","og_type":"article","og_title":"Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas","og_description":"Eiffage Energia has been awarded by Prysmian a large part of the project which REE (Electrical Network of Spain) and R\u00e9seau de Transport d&#8217;Electricit\u00e9 (RTE) are developing to increase the power exchange capacity between Spain and France. This project pretends to increase power exchange from 3 to 6% of maximal Peninsula power, strengthening the security ... Read more","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2013-04-03T10:00:13+00:00","og_image":[{"width":1300,"height":868,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg","type":"image\/jpeg"}],"author":"Eiffage Energia","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/"},"author":{"name":"Eiffage Energia","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/cf9c666f5eb3c12fba3b18aeb5edf4ec"},"headline":"Involved in strengthening for electrical interconnection between Spain and France","datePublished":"2013-04-03T10:00:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/"},"wordCount":294,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg","articleSection":["Eiffage Energ\u00eda"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/","name":"Involved in strengthening for electrical interconnection between Spain and France - Eiffage Energ\u00eda Sistemas","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg","datePublished":"2013-04-03T10:00:13+00:00","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2015\/05\/france-tunnel-entry-eiffage-energia.jpg","width":1300,"height":868},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2013\/04\/03\/interconexion-electrica-entre-espana-y-francia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Involved in strengthening for electrical interconnection between Spain and France"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/cf9c666f5eb3c12fba3b18aeb5edf4ec","name":"Eiffage Energia","sameAs":["http:\/\/www.dev.energia.eiffage.es"],"url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/eiffage-energia\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/11416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=11416"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/11416\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/9120"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=11416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=11416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=11416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}