{"id":20150,"date":"2019-06-25T08:56:28","date_gmt":"2019-06-25T06:56:28","guid":{"rendered":"http:\/\/www.eiffageenergiasistemas.com\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/"},"modified":"2022-02-17T15:49:34","modified_gmt":"2022-02-17T15:49:34","slug":"eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/","title":{"rendered":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line."},"content":{"rendered":"<p><a href=\"https:\/\/www.adif.es\/inicio\">ADIF (Spanish administrator of railway infrastructures)<\/a> has awarded Eiffage Energ\u00eda, in a UTE (Temporary Union of Companies) with <a href=\"http:\/\/www.telice.es\/\">Telice<\/a> S.A., the works and maintenance of the stations of self-transformation and energy remote control of the Pedralba-Orense section of the Madrid-Galicia AVE line, with a budget of more than 10 million euros.<\/p>\n<p>The <a href=\"http:\/\/www.eiffageenergiasistemas.com\/lineas-actividad\/infraestructuras-electricas\/\">works<\/a>, which have just begun and that must be completed in 9 months, consist of the construction of various stations of self-transformation for the power supply system to the catenary provided by ADIF for the aforementioned High Speed section.<\/p>\n<p>The 2&#215;25 kV electrification system supplies power at a voltage of 50 kV between the contact line and the feeder and the rolling stock takes power at a voltage of 25 kV between the contact line and the rail, therefore, requiring the installation of 55\/27.5kV ratio self-transformers approximately every 15 kilometres.<\/p>\n<p>In order to accommodate these self-transformers and their auxiliary equipment, it is planned to build facilities located in the vicinity of the tracks and which will be of two types, depending on whether the self-transformers are installed near neutral zones between substations, final self-transformation stations (ATFs), or en route, stations of intermediate self-transformation (ATIs).<\/p>\n<p>Each traction substation corresponds to an area, which includes the stations of self-transformation associated with the substation of the area and which is defined as the catenary path that, in normal, non-degraded mode of operation, is fed by said substation.<\/p>\n<p>With regard to <a href=\"http:\/\/www.eiffageenergiasistemas.com\/lineas-actividad\/mantenimiento\/\">maintenance,<\/a> which will take place for 24 months, once the construction of each of the self-transformation stations has been completed, work will be carried out, on the one hand, on <strong>predictive maintenance<\/strong> performed at predetermined intervals or in accordance with prescribed criteria, and aimed at reducing the probability of failure or degradation of the operation of an element; and <strong>corrective maintenance<\/strong> carried out after the recognition of a fault and intended to bring an element to a state in which it can perform the required function.    \t<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ADIF (Spanish administrator of railway infrastructures) has awarded Eiffage Energ\u00eda, in a UTE (Temporary Union of Companies) with Telice S.A., the works and maintenance of the stations of self-transformation and energy remote control of the Pedralba-Orense section of the Madrid-Galicia AVE line, with a budget of more than 10 million euros. The works, which have &#8230; <a title=\"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line.\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/\" aria-label=\"Read more about Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line.\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20077,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1333,1339,1335],"tags":[760,614],"class_list":["post-20150","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en","category-infraestructuras-electricas-en","category-mantenimiento-en","tag-infraestructuras-electricas-en","tag-mantenimiento-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"og:description\" content=\"ADIF (Spanish administrator of railway infrastructures) has awarded Eiffage Energ\u00eda, in a UTE (Temporary Union of Companies) with Telice S.A., the works and maintenance of the stations of self-transformation and energy remote control of the Pedralba-Orense section of the Madrid-Galicia AVE line, with a budget of more than 10 million euros. The works, which have ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2019-06-25T06:56:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-17T15:49:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1015\" \/>\n\t<meta property=\"og:image:height\" content=\"737\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Eiffage Energia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/\"},\"author\":{\"name\":\"Eiffage Energia\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/cf9c666f5eb3c12fba3b18aeb5edf4ec\"},\"headline\":\"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line.\",\"datePublished\":\"2019-06-25T06:56:28+00:00\",\"dateModified\":\"2022-02-17T15:49:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/\"},\"wordCount\":347,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/adif-1.png\",\"keywords\":[\"Electric Infrastructure\",\"mantenimiento\"],\"articleSection\":[\"Eiffage Energ\u00eda\",\"Electric Infrastructure\",\"Maintenance\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/\",\"name\":\"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/adif-1.png\",\"datePublished\":\"2019-06-25T06:56:28+00:00\",\"dateModified\":\"2022-02-17T15:49:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/adif-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2019\\\/06\\\/adif-1.png\",\"width\":1015,\"height\":737},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2019\\\/06\\\/25\\\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/cf9c666f5eb3c12fba3b18aeb5edf4ec\",\"name\":\"Eiffage Energia\",\"sameAs\":[\"http:\\\/\\\/www.dev.energia.eiffage.es\"],\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/eiffage-energia\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/","og_locale":"en_US","og_type":"article","og_title":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas","og_description":"ADIF (Spanish administrator of railway infrastructures) has awarded Eiffage Energ\u00eda, in a UTE (Temporary Union of Companies) with Telice S.A., the works and maintenance of the stations of self-transformation and energy remote control of the Pedralba-Orense section of the Madrid-Galicia AVE line, with a budget of more than 10 million euros. The works, which have ... Read more","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2019-06-25T06:56:28+00:00","article_modified_time":"2022-02-17T15:49:34+00:00","og_image":[{"width":1015,"height":737,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png","type":"image\/png"}],"author":"Eiffage Energia","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/"},"author":{"name":"Eiffage Energia","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/cf9c666f5eb3c12fba3b18aeb5edf4ec"},"headline":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line.","datePublished":"2019-06-25T06:56:28+00:00","dateModified":"2022-02-17T15:49:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/"},"wordCount":347,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png","keywords":["Electric Infrastructure","mantenimiento"],"articleSection":["Eiffage Energ\u00eda","Electric Infrastructure","Maintenance"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/","name":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line. - Eiffage Energ\u00eda Sistemas","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png","datePublished":"2019-06-25T06:56:28+00:00","dateModified":"2022-02-17T15:49:34+00:00","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2019\/06\/adif-1.png","width":1015,"height":737},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2019\/06\/25\/eiffage-energia-ejecutara-las-obras-y-el-mantenimiento-de-los-centros-de-autotransformacion-y-telemando-de-energia-de-un-tramo-del-ave-madrid-galicia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage Energ\u00eda will implement the works and maintenance of the stations of self-transformation and energy remote control of a section of the Madrid-Galicia AVE line."}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/cf9c666f5eb3c12fba3b18aeb5edf4ec","name":"Eiffage Energia","sameAs":["http:\/\/www.dev.energia.eiffage.es"],"url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/eiffage-energia\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/20150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=20150"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/20150\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/20077"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=20150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=20150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=20150"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}