{"id":41104,"date":"2020-08-25T09:00:15","date_gmt":"2020-08-25T07:00:15","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/"},"modified":"2021-05-11T15:26:50","modified_gmt":"2021-05-11T15:26:50","slug":"the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/","title":{"rendered":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation"},"content":{"rendered":"<p>The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation . It is a project carried out for Coronation, comprising ENGIE , Mirova and Forestalia, in the towns of Monforte de Moyuela and Loscos, between the provinces of Zaragoza and Teruel, in Arag\u00f3n.<\/p>\n<blockquote><p>This is the Cluster Jiloca project, which has total installed power of 73 MW and which has involved some 300 professionals in its construction.<\/p><\/blockquote>\n<p><strong>Cluster Jiloca<\/strong><br \/>\nThe project includes two wind farms, two substations and a high-voltage line.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-40083 size-full\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca.jpg\" alt=\"\" width=\"1400\" height=\"951\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca.jpg 1400w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca-300x204.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca-1024x696.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca-768x522.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><br \/>\n<strong>Monforte I Wind Farm<\/strong><br \/>\nThe Monforte wind farms are already in operation. The first farm has total installed power of 50 MW. In addition, it has 13 x 3.83 MW wind turbines, 14.9 km of access roads, internal roads and 13 platforms. Construction involved 12.5 km of trench, laying and connection of medium voltage network and fibre optics.<\/p>\n<p><strong>Monforte II Wind Farm<\/strong><br \/>\nIn this case, total installed power is 23 MW. It also has 6 wind turbines of 3.83 MW, 3.1 km of access roads, internal roads, 6 platforms, foundations and a medium voltage network. 5.8 km of trench, laying and connection of medium voltage network and fibre optics were also executed. Muniesa and Monforte Substations We at Eiffage Energ\u00eda also carried out civil works, electromechanical assembly, testing and start-up of the Muniesa and Monforte substations as part of the Cluster Jiloca. They have a control and protection system, a communication system, an anti-intrusion and fire protection system. As well as the installation of auxiliary services with a 160kVA transformer. Monforte-Segura High Voltage Line Lastly, it is worth highlighting the civil works, assembly and raising of towers and cable laying for a 220kV High Voltage line, 10km, a simple duplex circuit and 35 supports. Eiffage Energ\u00eda has built 5.6 GW of renewable energy and is expected to easily exceed 6 GW by the end of the year. Renewable energies represent one of the pillars of the company, a sector in which we have been working for more than 20 years. During the past year, we installed a total of 1,012 MW of photovoltaic energy and 250 MW of wind energy through projects in Spain, Mexico, Chile, Senegal and Belgium. Figures that make us one of the companies that has built the most renewable facilities in Spain. Eiffage Energ\u00eda is responsible for nearly 80% of the Eiffage Group\u2019s renewables activity worldwide, preventing the emission of more than 10 million tons of CO2 per year into the atmosphere.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation . It is a project carried out for Coronation, comprising ENGIE , Mirova and Forestalia, in the towns of Monforte de Moyuela and Loscos, between the provinces of Zaragoza &#8230; <a title=\"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/\" aria-label=\"Read more about The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":40084,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1359,1435],"tags":[1484,1436,1483],"class_list":["post-41104","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en-2","category-renewable-energies","tag-cluster-jiloca-en","tag-energia-eolica-en-2","tag-parque-eolico-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation<\/title>\n<meta name=\"description\" content=\"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\" \/>\n<meta property=\"og:description\" content=\"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-25T07:00:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-11T15:26:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"945\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Mart\u00ednez Garc\u00eda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/\"},\"author\":{\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\"},\"headline\":\"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\",\"datePublished\":\"2020-08-25T07:00:15+00:00\",\"dateModified\":\"2021-05-11T15:26:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/\"},\"wordCount\":420,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/cluster-jiloca1.jpg\",\"keywords\":[\"Cluster Jiloca\",\"energ\u00eda e\u00f3lica\",\"parque e\u00f3lico\"],\"articleSection\":[\"Eiffage Energ\u00eda\",\"Renewable Energies\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/\",\"name\":\"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/cluster-jiloca1.jpg\",\"datePublished\":\"2020-08-25T07:00:15+00:00\",\"dateModified\":\"2021-05-11T15:26:50+00:00\",\"description\":\"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/cluster-jiloca1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/cluster-jiloca1.jpg\",\"width\":1400,\"height\":945},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/08\\\/25\\\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\",\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristina\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation","description":"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/","og_locale":"en_US","og_type":"article","og_title":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation","og_description":"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2020-08-25T07:00:15+00:00","article_modified_time":"2021-05-11T15:26:50+00:00","og_image":[{"width":1400,"height":945,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg","type":"image\/jpeg"}],"author":"Cristina Mart\u00ednez Garc\u00eda","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/"},"author":{"name":"Cristina Mart\u00ednez Garc\u00eda","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf"},"headline":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation","datePublished":"2020-08-25T07:00:15+00:00","dateModified":"2021-05-11T15:26:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/"},"wordCount":420,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg","keywords":["Cluster Jiloca","energ\u00eda e\u00f3lica","parque e\u00f3lico"],"articleSection":["Eiffage Energ\u00eda","Renewable Energies"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/","name":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg","datePublished":"2020-08-25T07:00:15+00:00","dateModified":"2021-05-11T15:26:50+00:00","description":"The Monforte I and Monforte II wind farms, the Monforte and Muniesa substations and the Monforte-Segura high-voltage line, built by Eiffage Energ\u00eda, are already in operation","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/08\/cluster-jiloca1.jpg","width":1400,"height":945},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/08\/25\/the-monforte-wind-farms-built-by-eiffage-energia-for-coronation-are-already-in-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"The Monforte wind farms built by Eiffage Energ\u00eda for Coronation are already in operation"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf","name":"Cristina Mart\u00ednez Garc\u00eda","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/41104","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=41104"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/41104\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/40084"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=41104"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=41104"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=41104"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}