{"id":41119,"date":"2020-06-17T10:47:22","date_gmt":"2020-06-17T08:47:22","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/"},"modified":"2021-05-11T15:25:07","modified_gmt":"2021-05-11T15:25:07","slug":"eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/","title":{"rendered":"Eiffage to build the new global data processing centre for Metro de Madrid"},"content":{"rendered":"<p>Metro de Madrid DPC. Metro de Madrid has awarded a contract to\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/\">Eiffage Energ\u00eda<\/a>\u00a0(70%), in a temporary joint venture with\u00a0<a href=\"https:\/\/www.eiffageinfraestructuras.es\/\">Eiffage Infraestructuras<\/a>\u00a0(30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities. The contract for the project was awarded for a total amount of around 14 million euros and an execution period of 18 months.\u00a0 The Data Processing Centre, on which work will begin in July, will allow Metro de Madrid to meet its current and foreseeable needs in the short term (Station 4.0 project) as well as over the next 20 years.<\/p>\n<p><strong>Reliability requirements<\/strong><\/p>\n<p>This DPC is intended to meet reliability requirements, in line with the mission critical nature of the systems that it hosts. In other words, with no maintenance shutdown windows or single points of failure, corresponding to the failure tolerance classification.<\/p>\n<blockquote><p>The fundamental objective of the design is service availability.<\/p><\/blockquote>\n<p>All necessary redundancies will be provided for this purpose, so that maintenance can be performed on the infrastructure without interrupting the IT equipment service. It will also be ensured that the failure of any infrastructure component or system does not affect the IT service.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-40045\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/metro-838523_1920-1.jpg\" alt=\"Metro de Madrid\" width=\"1400\" height=\"933\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/metro-838523_1920-1.jpg 1400w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/metro-838523_1920-1-300x200.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/metro-838523_1920-1-1024x682.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/metro-838523_1920-1-768x512.jpg 768w\" sizes=\"(max-width: 1400px) 100vw, 1400px\" \/><\/p>\n<p><strong>Energy efficiency<\/strong><\/p>\n<p>Energy efficiency has been sought as a secondary objective to decrease the facility&#8217;s overall electricity consumption. Another objective is to guarantee the growth and new projects undertaken by Metro de Madrid over the next twenty years. It should be emphasised that this centre will become Metro\u2019s main DPC.<\/p>\n<p><strong>About Eiffage Energ\u00eda\u00a0<\/strong><\/p>\n<p>With support from the Eiffage Group and with more than 170 years&#8217; experience, a presence on 5 continents and more than 70,400 employees, Eiffage Energ\u00eda has become a national and international benchmark in the sectors of electrical infrastructure, installations, maintenance, electromedicine, renewable energy, and civil works and construction, providing a comprehensive 360\u00ba service. Eiffage Energ\u00eda has eight subsidiaries, four of which are located on the American continent:\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/eiffage-energia\/eiffage-chile\/\">Eiffage Energ\u00eda Chile<\/a>, Eiffage Energ\u00eda Peru, Eiffage Energ\u00eda Mexico and Eiffage Energ\u00eda Jamaica; along with Inelbo, Conscytec, EDS and Electromedical in Spain. Eiffage Energ\u00eda is currently immersed in a process of expanding into new markets around the world, for which it has a workforce of over 3400 professionals in its six business areas.<\/p>\n<p><strong>About Eiffage Infraestructuras<\/strong><\/p>\n<p>Eiffage Infraestructuras carries out its activity in the public works construction and building sector, aggregates manufacturing, the manufacturing of concrete, mortar and prefabricated structures and the laying of asphalt materials (it is a leader in Spain in this sector). Eiffage Infraestructuras was created from the union of historical companies in the public works and construction sector: PANASFALTO, RUS, LOS SERRANOS GROUP and TRIALSA. Each of these companies contributes its professionalism, experience, human team, staff, strong industrial potential and customer-minded approach.\u00a0 A union that is boosting the competence and effectiveness of these large companies, giving them access to embarking on larger-scale projects without forgetting their roots. Its extensive experience allows it to make bids that include all required services, and to deliver turnkey projects to customers. In addition, Eiffage Infraestructuras has stakes in other companies in the sector such as SGASA, PABASFALTO, MEBISA and MASFALT, among others, thus expanding its services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Metro de Madrid DPC. Metro de Madrid has awarded a contract to\u00a0Eiffage Energ\u00eda\u00a0(70%), in a temporary joint venture with\u00a0Eiffage Infraestructuras\u00a0(30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities. The contract for the project was awarded for a total amount of around 14 million euros and an &#8230; <a title=\"Eiffage to build the new global data processing centre for Metro de Madrid\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/\" aria-label=\"Read more about Eiffage to build the new global data processing centre for Metro de Madrid\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":40046,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1359],"tags":[1495,1494,1442,1493,1496,1497],"class_list":["post-41119","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en-2","tag-cpd-en","tag-data-processing-centre","tag-eficiencia-energetica-en-2","tag-eiffage-en-2","tag-infraestructures","tag-metro-de-madrid-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Eiffage to build the new global data processing centre for Metro de Madrid<\/title>\n<meta name=\"description\" content=\"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Eiffage to build the new global data processing centre for Metro de Madrid\" \/>\n<meta property=\"og:description\" content=\"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-17T08:47:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-11T15:25:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"933\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Mart\u00ednez Garc\u00eda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/\"},\"author\":{\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\"},\"headline\":\"Eiffage to build the new global data processing centre for Metro de Madrid\",\"datePublished\":\"2020-06-17T08:47:22+00:00\",\"dateModified\":\"2021-05-11T15:25:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/\"},\"wordCount\":537,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/06\\\/parada-metro-madrid.jpg\",\"keywords\":[\"CPD\",\"data processing centre\",\"Eficiencia energ\u00e9tica\",\"eiffage\",\"Infraestructures:\",\"Metro de Madrid\"],\"articleSection\":[\"Eiffage Energ\u00eda\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/\",\"name\":\"Eiffage to build the new global data processing centre for Metro de Madrid\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/06\\\/parada-metro-madrid.jpg\",\"datePublished\":\"2020-06-17T08:47:22+00:00\",\"dateModified\":\"2021-05-11T15:25:07+00:00\",\"description\":\"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/06\\\/parada-metro-madrid.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/06\\\/parada-metro-madrid.jpg\",\"width\":1400,\"height\":933,\"caption\":\"CPD-METRO-DE-MADRID-EIFFAGE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/06\\\/17\\\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage to build the new global data processing centre for Metro de Madrid\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\",\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristina\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Eiffage to build the new global data processing centre for Metro de Madrid","description":"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/","og_locale":"en_US","og_type":"article","og_title":"Eiffage to build the new global data processing centre for Metro de Madrid","og_description":"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2020-06-17T08:47:22+00:00","article_modified_time":"2021-05-11T15:25:07+00:00","og_image":[{"width":1400,"height":933,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg","type":"image\/jpeg"}],"author":"Cristina Mart\u00ednez Garc\u00eda","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/"},"author":{"name":"Cristina Mart\u00ednez Garc\u00eda","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf"},"headline":"Eiffage to build the new global data processing centre for Metro de Madrid","datePublished":"2020-06-17T08:47:22+00:00","dateModified":"2021-05-11T15:25:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/"},"wordCount":537,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg","keywords":["CPD","data processing centre","Eficiencia energ\u00e9tica","eiffage","Infraestructures:","Metro de Madrid"],"articleSection":["Eiffage Energ\u00eda"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/","name":"Eiffage to build the new global data processing centre for Metro de Madrid","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg","datePublished":"2020-06-17T08:47:22+00:00","dateModified":"2021-05-11T15:25:07+00:00","description":"Metro de Madrid DPC. Metro de Madrid has awarded a contract to Eiffage Energ\u00eda (70%), in a temporary joint venture with Eiffage Infraestructuras (30%), for works to build a new Global Data Processing Centre (DPC) at the metro company\u2019s own facilities.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/06\/parada-metro-madrid.jpg","width":1400,"height":933,"caption":"CPD-METRO-DE-MADRID-EIFFAGE"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/06\/17\/eiffage-to-build-the-new-global-data-processing-centre-for-metro-de-madrid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage to build the new global data processing centre for Metro de Madrid"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf","name":"Cristina Mart\u00ednez Garc\u00eda","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/41119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=41119"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/41119\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/40046"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=41119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=41119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=41119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}