{"id":43625,"date":"2020-03-18T09:56:41","date_gmt":"2020-03-18T09:56:41","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/"},"modified":"2022-02-17T14:51:39","modified_gmt":"2022-02-17T14:51:39","slug":"repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/","title":{"rendered":"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon"},"content":{"rendered":"<p>Eiffage Energ\u00eda is the company responsible for the construction of six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for <a href=\"https:\/\/www.repsol.com\/es\/conocenos\/que-hacemos\/desarrollo-energias-renovables\/index.cshtml\" target=\"_blank\" rel=\"noopener noreferrer\">Repsol<\/a> in Arag\u00f3n, in the provinces of <a href=\"https:\/\/elperiodicodelaenergia.com\/repsol-inicia-la-construccion-de-su-primer-gran-parque-eolico-en-espana\/\" target=\"_blank\" rel=\"noopener noreferrer\">Teruel and Zaragoza<\/a>. The project as a whole represents a total capacity of 237 MW at the Hilada Honda and Las Majas VII A, B, C, D and E wind farms. According to information recently published by <a href=\"https:\/\/www.elperiodicodearagon.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">El Peri\u00f3dico de Arag\u00f3n<\/a>, Arag\u00f3n was the number one renewable energy region in Spain last year, particularly in terms of wind power. Wind turbines commissioned during 2019 added 1,025 megawatts (MW) to the power output of the leading green technology, which increased its capacity in the community by 49% to a record 3,121 MW. In this way, the community of Aragon has become the epicentre of the energy transition in Spain, leading the development of renewables. In fact, it is the self-governing community that raised its clean energy capacity the most in 2019.<\/p>\n<h4>REPSOL TARGET: NET ZERO CARBON EMISSIONS BY 2050<\/h4>\n<p>With this project, Repsol becomes a client of Eiffage Energ\u00eda in the renewable energy sector, having announced last December that it was going to refocus the company\u2019s strategy to achieve net zero carbon emissions by 2050. Repsol\u2019s renewable assets under development have a total capacity of 2,045 MW, which together with the 2,952 MW of total installed capacity that the company currently has, consolidates Repsol as a major player in the generation of low-emission electricity on the Iberian Peninsula. It should be noted that <a href=\"https:\/\/www.eiffageenergiasistemas.com\/eiffage-energia-ha-cumplido-el-100-de-los-compromisos-adquiridos-en-2019\/\" target=\"_blank\" rel=\"noopener noreferrer\">Eiffage Energ\u00eda<\/a> installed a total of 1,012 MW of photovoltaic energy and 250 MW of wind energy through projects in Spain, Mexico, Chile, Senegal and Belgium in 2019. Figures that make it one of the companies that has built the most renewable facilities in Spain.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eiffage Energ\u00eda is the company responsible for the construction of six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n, in the provinces of Teruel and Zaragoza. The project as a whole represents a total capacity of 237 MW at the Hilada Honda and Las Majas VII A, &#8230; <a title=\"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/\" aria-label=\"Read more about Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":39965,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1359],"tags":[],"class_list":["post-43625","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS<\/title>\n<meta name=\"description\" content=\"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS\" \/>\n<meta property=\"og:description\" content=\"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-18T09:56:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-17T14:51:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"935\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Mart\u00ednez Garc\u00eda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/\"},\"author\":{\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\"},\"headline\":\"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon\",\"datePublished\":\"2020-03-18T09:56:41+00:00\",\"dateModified\":\"2022-02-17T14:51:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/\"},\"wordCount\":308,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/parque-eolico_aragon.jpg\",\"articleSection\":[\"Eiffage Energ\u00eda\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/\",\"name\":\"REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/parque-eolico_aragon.jpg\",\"datePublished\":\"2020-03-18T09:56:41+00:00\",\"dateModified\":\"2022-02-17T14:51:39+00:00\",\"description\":\"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/parque-eolico_aragon.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/03\\\/parque-eolico_aragon.jpg\",\"width\":1400,\"height\":935},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/03\\\/18\\\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\",\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristina\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS","description":"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/","og_locale":"en_US","og_type":"article","og_title":"REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS","og_description":"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2020-03-18T09:56:41+00:00","article_modified_time":"2022-02-17T14:51:39+00:00","og_image":[{"width":1400,"height":935,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg","type":"image\/jpeg"}],"author":"Cristina Mart\u00ednez Garc\u00eda","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/"},"author":{"name":"Cristina Mart\u00ednez Garc\u00eda","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf"},"headline":"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon","datePublished":"2020-03-18T09:56:41+00:00","dateModified":"2022-02-17T14:51:39+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/"},"wordCount":308,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg","articleSection":["Eiffage Energ\u00eda"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/","name":"REPSOL AWARDS EIFFAGE ENERG\u00cdA THE CONTRACT FOR CONSTRUCTION OF 6 WIND FARMS","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg","datePublished":"2020-03-18T09:56:41+00:00","dateModified":"2022-02-17T14:51:39+00:00","description":"Eiffage Energ\u00eda is building six wind farms, two electrical substations, two high-voltage lines and one medium-voltage line for Repsol in Arag\u00f3n.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/03\/parque-eolico_aragon.jpg","width":1400,"height":935},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/03\/18\/repsol-awards-eiffage-energia-the-contract-for-construction-of-six-wind-farms-in-aragon\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Repsol awards Eiffage Energia the contract for construction of six wind farms in Aragon"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf","name":"Cristina Mart\u00ednez Garc\u00eda","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=43625"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/39965"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=43625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=43625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=43625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}