{"id":43636,"date":"2020-04-21T09:11:54","date_gmt":"2020-04-21T07:11:54","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/"},"modified":"2020-04-21T09:11:54","modified_gmt":"2020-04-21T09:11:54","slug":"eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/","title":{"rendered":"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres"},"content":{"rendered":"<p>Since 2007, Eiffage Energ\u00eda, through its <a href=\"https:\/\/www.eiffageenergiasistemas.com\/eiffage-energia\/inelbo\/\">Inelbo<\/a> subsidiary, has been working on the installations of Mercadona\u2019s logistics centres, maintaining medium-voltage, low-voltage and special electrical installations. An essential service that continued to be provided during these days. Inelbo is currently working for <a href=\"https:\/\/www.mercadona.es\/es\" target=\"_blank\" rel=\"noopener noreferrer\">Mercadona<\/a> to install the logistics blocks at Parc Sagunt (Valencia), with a surface area of 70,000 m2 and a capacity of 15 MWA, and Vitoria, with a surface area of 70,000 m2 and a capacity of 18.5 MWA. In addition, it is installing the building for perishable and dry goods in Zaragoza, with a surface area of 29,000 m2 and a capacity of 8.75 MWA.<\/p>\n<h3>Mercadona Logistics Centres in operation<\/h3>\n<p>Among the completed facilities, it is worth mentioning the logistics blocks in <a href=\"https:\/\/www.eiffageenergiasistemas.com\/project\/centro-logistico-de-alto-rendimiento-de-mercadona-en-abrera\/\">Abrera (Barcelona)<\/a>, with a surface area of 95,000 m2 and a capacity of 30.7 MWA, a yardstickfor this type of facility; &nbsp;Ciempozuelos (Madrid), with a surface area of 90,000 m2 and a capacity of 35.5 MWA; Villadangos (Le\u00f3n), with a surface area of 70,500 m2 and a capacity of 21.6 MWA; Guadix (Granada), with a surface area of 37,000 m2 and a capacity of 7.8 MWA; Povoa de Varzim, in Oporto (Portugal), with a surface area of 24,000 m2 and a capacity of 4.6 MWA, and the preservation and ripening plant in Villadangos (Le\u00f3n), with a surface area of 10,000 m2 and a capacity of 1.6 MWA. In addition, the installations of the Colmena online logistics centres in Zona Franca (Barcelona), with a surface area of 12,000 m2 and a capacity of 1.2 MWA, and in Getafe (Madrid), with a surface area of 15,500 m2 and a power of 1.6 MWA, have also been completed. The <a href=\"https:\/\/www.elmundo.es\/economia\/ahorro-y-consumo\/2020\/04\/20\/5e9d586f21efa09f398b4616.html\" target=\"_blank\" rel=\"noopener noreferrer\">Colmena online logistics centres<\/a> are smaller logistics centres for attending to online sales. Mercadona has three of these centres, two of which were installed by Eiffage Energ\u00eda through Inelbo.<\/p>\n<p><a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/Mercadona_Centros-log\u00edsticos.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-25024\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/Mercadona_Centros-log\u00edsticos.jpg\" alt=\"Eiffage-Energ\u00eda-trabaja-en-los-centros-log\u00edsticos-de-Mercadona\"><\/a><\/p>\n<h3><b>Inelbo<\/b><\/h3>\n<p>Inelbo, based in Alicante, started its activity in&nbsp;1987. It currently has a staff of more than 250 people and offices in the Valencian Community, Catalonia, Region of Murcia and Madrid. It specialises in all types of interior installations (industrial, tertiary sector and building) and electrical maintenance (transformer stations, public facilities, fire detection, etc.). Inelbo is currently consolidated as a leading company in: Comprehensive management of medium- and low-voltage electrical installation projects; Engineering, from study to execution, and management and automation systems.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since 2007, Eiffage Energ\u00eda, through its Inelbo subsidiary, has been working on the installations of Mercadona\u2019s logistics centres, maintaining medium-voltage, low-voltage and special electrical installations. An essential service that continued to be provided during these days. Inelbo is currently working for Mercadona to install the logistics blocks at Parc Sagunt (Valencia), with a surface area &#8230; <a title=\"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/\" aria-label=\"Read more about Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":40006,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1359],"tags":[],"class_list":["post-43636","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES<\/title>\n<meta name=\"description\" content=\"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES\" \/>\n<meta property=\"og:description\" content=\"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2020-04-21T07:11:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-04-21T09:11:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"1050\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Mart\u00ednez Garc\u00eda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/\"},\"author\":{\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\"},\"headline\":\"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres\",\"datePublished\":\"2020-04-21T07:11:54+00:00\",\"dateModified\":\"2020-04-21T09:11:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/\"},\"wordCount\":391,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg\",\"articleSection\":[\"Eiffage Energ\u00eda\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/\",\"name\":\"INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg\",\"datePublished\":\"2020-04-21T07:11:54+00:00\",\"dateModified\":\"2020-04-21T09:11:54+00:00\",\"description\":\"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2020\\\/04\\\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg\",\"width\":1400,\"height\":1050,\"caption\":\"INELBO-INSTALA-LOS-CENTROS-LOG\u00cdSTICOS-DE-MERCADONA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2020\\\/04\\\/21\\\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\",\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristina\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES","description":"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/","og_locale":"en_US","og_type":"article","og_title":"INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES","og_description":"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2020-04-21T07:11:54+00:00","article_modified_time":"2020-04-21T09:11:54+00:00","og_image":[{"width":1400,"height":1050,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg","type":"image\/jpeg"}],"author":"Cristina Mart\u00ednez Garc\u00eda","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/"},"author":{"name":"Cristina Mart\u00ednez Garc\u00eda","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf"},"headline":"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres","datePublished":"2020-04-21T07:11:54+00:00","dateModified":"2020-04-21T09:11:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/"},"wordCount":391,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg","articleSection":["Eiffage Energ\u00eda"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/","name":"INELBO INSTALLS MERCADONA\u2019S LOGISTICS CENTRES","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg","datePublished":"2020-04-21T07:11:54+00:00","dateModified":"2020-04-21T09:11:54+00:00","description":"Eiffage Energ\u00eda, through its Inelbo subsidiary, has been installing Mercadona\u2019s logistics centres since 2007, maintaining their electrical installations.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2020\/04\/inelbo-instala-los-centros-logisticos-de-mercadona.jpg","width":1400,"height":1050,"caption":"INELBO-INSTALA-LOS-CENTROS-LOG\u00cdSTICOS-DE-MERCADONA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2020\/04\/21\/eiffage-energias-inelbo-subsidiary-has-been-working-since-2007-on-the-installations-of-mercadonas-logistics-centres\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage Energ\u00eda\u2019s Inelbo subsidiary has been working since 2007 on the installations of Mercadona\u2019s logistics centres"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf","name":"Cristina Mart\u00ednez Garc\u00eda","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=43636"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43636\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/40006"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=43636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=43636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=43636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}