{"id":43730,"date":"2022-02-02T10:55:26","date_gmt":"2022-02-02T10:55:26","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/"},"modified":"2022-02-02T10:55:26","modified_gmt":"2022-02-02T10:55:26","slug":"the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/","title":{"rendered":"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year"},"content":{"rendered":"<p>We are completing work on the Paderne photovoltaic farm, 245 km from Lisbon, Portugal. A project&nbsp;that is scheduled to be powered up during the first quarter of this year. It is a 17.4 MW plant. The project is being implemented in a joint venture with&nbsp;<a href=\"https:\/\/www.jjtome.pt\/jjtome\/\">JJTom\u00e9<\/a>, an Eiffage Group company that&nbsp;is in charge of the High Voltage evacuation line and the step-up substation. This photovoltaic farm, with a budget of around 10 million euros, occupies a surface area of 20 hectares. It will have three 5.07-MVA transformer substations and 38,892 photovoltaic modules.<\/p>\n<blockquote><p>The Paderne plant <strong>will avoid 7,500 tonnes of atmospheric<\/strong>&nbsp; CO2 emissions each year and provide clean energy to some 9,000 people.<\/p><\/blockquote>\n<p>During its construction, <strong>direct employment was generated for around 60 people<\/strong>.<span class=\"Apple-converted-space\">&nbsp;<\/span> In addition, we have run several <strong>environmental activities<\/strong>, including the relocation of 150 olive trees as a vegetation screen and 12 carob trees for landscape integration; and the creation of green areas where the area\u2019s fauna can feed.<\/p>\n<h3><b>Eiffage Energ\u00eda\u2019s expertisein Portugal<\/b><\/h3>\n<p>Eiffage Energ\u00eda&#8217;s experience in Portugal dates back to 2008, with the EPC construction of&nbsp;<a href=\"https:\/\/www.eiffageenergiasistemas.com\/project\/planta-solar-fotovoltaica-amareleja\/\">Amareleja.<\/a>&nbsp;At that time, it was the largest solar farm in Europe with a capacity of 46 MW of power. As of February this year, we have participated in the construction of 80 photovoltaic plants, with a total installed power of de 3,500 MW. https:\/\/youtu.be\/fYJTAelgpjA <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7169.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-31325\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7169.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7168.jpg\"><img decoding=\"async\" class=\"alignleft size-medium wp-image-31322\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7168.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7163-rotated.jpg\"><img decoding=\"async\" class=\"alignleft size-medium wp-image-31319\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7163-rotated.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7162-rotated.jpg\"><img decoding=\"async\" class=\"alignleft size-medium wp-image-31316\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7162-rotated.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7170.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-31313\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/IMG-7170.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Arcoiris-rotated.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-31298\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Arcoiris-rotated.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/S43-1.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-31304\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/S43-1.jpg\" alt=\"\"><\/a> <a href=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/S46_2.jpg\"><img decoding=\"async\" class=\"alignleft size-full wp-image-31301\" src=\"\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/S46_2.jpg\" alt=\"\"><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We are completing work on the Paderne photovoltaic farm, 245 km from Lisbon, Portugal. A project&nbsp;that is scheduled to be powered up during the first quarter of this year. It is a 17.4 MW plant. The project is being implemented in a joint venture with&nbsp;JJTom\u00e9, an Eiffage Group company that&nbsp;is in charge of the High &#8230; <a title=\"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/\" aria-label=\"Read more about The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43679,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1359],"tags":[1470,1485,1730,1726,1727],"class_list":["post-43730","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-en-2","tag-energia-fotovoltaica-en","tag-energia-solar-en-2","tag-paderne-en","tag-photovoltaic-plant","tag-portugal-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Paderne solar farm will be commissioned in the first quarter of this year<\/title>\n<meta name=\"description\" content=\"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Paderne solar farm will be commissioned in the first quarter of this year\" \/>\n<meta property=\"og:description\" content=\"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-02T10:55:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"788\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Vanessa Landete\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/\"},\"author\":{\"name\":\"Vanessa Landete\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/ee0b6cef257519e591618399167038ad\"},\"headline\":\"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year\",\"datePublished\":\"2022-02-02T10:55:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/\"},\"wordCount\":244,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/paderne-eiffage-energia.jpg\",\"keywords\":[\"energia fotovoltaica\",\"Energ\u00eda Solar\",\"Paderne\",\"photovoltaic plant\",\"Portugal\"],\"articleSection\":[\"Eiffage Energ\u00eda\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/\",\"name\":\"The Paderne solar farm will be commissioned in the first quarter of this year\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/paderne-eiffage-energia.jpg\",\"datePublished\":\"2022-02-02T10:55:26+00:00\",\"description\":\"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/paderne-eiffage-energia.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/01\\\/paderne-eiffage-energia.jpg\",\"width\":1400,\"height\":788,\"caption\":\"DCIM100MEDIADJI_0474.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/02\\\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/ee0b6cef257519e591618399167038ad\",\"name\":\"Vanessa Landete\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/vlandete\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Paderne solar farm will be commissioned in the first quarter of this year","description":"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/","og_locale":"en_US","og_type":"article","og_title":"The Paderne solar farm will be commissioned in the first quarter of this year","og_description":"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2022-02-02T10:55:26+00:00","og_image":[{"width":1400,"height":788,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg","type":"image\/jpeg"}],"author":"Vanessa Landete","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/"},"author":{"name":"Vanessa Landete","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/ee0b6cef257519e591618399167038ad"},"headline":"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year","datePublished":"2022-02-02T10:55:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/"},"wordCount":244,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg","keywords":["energia fotovoltaica","Energ\u00eda Solar","Paderne","photovoltaic plant","Portugal"],"articleSection":["Eiffage Energ\u00eda"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/","name":"The Paderne solar farm will be commissioned in the first quarter of this year","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg","datePublished":"2022-02-02T10:55:26+00:00","description":"We are completing work on the Paderne photovoltaic farm in Portugal, which is expected to be powered up during the first quarter of the year.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/01\/paderne-eiffage-energia.jpg","width":1400,"height":788,"caption":"DCIM100MEDIADJI_0474.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/02\/the-paderne-photovoltaic-farm-in-portugal-will-be-commissioned-during-the-first-quarter-of-this-year\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"The Paderne photovoltaic farm in Portugal will be commissioned during the first quarter of this year"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/ee0b6cef257519e591618399167038ad","name":"Vanessa Landete","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/vlandete\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43730","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=43730"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43730\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/43679"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=43730"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=43730"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=43730"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}