{"id":43779,"date":"2022-02-09T10:33:33","date_gmt":"2022-02-09T10:33:33","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/"},"modified":"2022-02-11T13:31:17","modified_gmt":"2022-02-11T13:31:17","slug":"we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/","title":{"rendered":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres"},"content":{"rendered":"\n<p>We have recently started work on the Almaraz I and II photovoltaic plant for Iberdrola in the province of C\u00e1ceres, which is scheduled for completion next summer.<\/p>\n\n<p>Eiffage Energ\u00eda is the company responsible for the engineering, construction, non-core supplies, assembly and commissioning of the plant, with a budget of over 9 million euros.<\/p>\n\n<p>The plant will have a total power of 79.91 MWp, 49.93 MWp of which will be provided by Almaraz I and 29.98 MWp by Almaraz II.<\/p>\n\n<h3 class=\"wp-block-heading\" id=\"energia-verde-para-60-000-familias\"><strong>Green energy for 60,000 families<\/strong><\/h3>\n\n<p>It is located on a 95 hectare site, has an environmental plan to protect local bird species and flora, and will also allow alternative land uses and will produce energy to supply around 60,000 families, avoiding atmospheric emissions of over 30,000 tonnes of CO2 per year. Local and\/or regional companies and personnel will be hired for its construction.<\/p>\n\n<p>The civil construction works will consist of building roads, drainage, foundations and trenches, as well as the perimeter fencing. For the mechanical assembly, 39,626 pole units, 2,045 fixed structure units and 177,915 photovoltaic module units will be installed.<\/p>\n\n<p>Alongside this, the electrical cabling will be laid, low and medium voltage connections will be made to the project\u2019s 11 storage batteries, monitoring and CCTV will be installed and final testing and commissioning will be carried out.<\/p>\n\n<p>Electricity will be evacuated from the project through a 30 kV line that will pass underneath the A-5 motorway and connect to the transformer substation.<\/p>\n\n<p>According to the latest figures, we have built 80 photovoltaic plants with an installed power of 3.5 GW. These figures put us as one of the leading companies in the construction of these facilities, both in Spain and internationally.\u00a0<\/p>\n\n<h3 class=\"wp-block-heading\" id=\"planta-solar-nunez-de-balboa\"><strong>\u201cN\u00fa\u00f1ez de Balboa\u201d solar farm<\/strong><\/h3>\n\n<p>Among the latest photovoltaic projects carried out for Iberdrola, one of our main clients, special mention should be made of the \u201cN\u00fa\u00f1ez de Balboa\u201d solar farm located in Usagre (Badajoz).<\/p>\n\n<p>It is a 500 MW farm that supplies power to 250,000 people, avoiding atmospheric emissions of 215,000 tonnes of CO2 per year.<\/p>\n\n<h3 class=\"wp-block-heading\" id=\"planta-solar-campo-de-aranuelo-i-y-ii\"><strong>Campo de Ara\u00f1uelo I and II Solar Farm<\/strong><\/h3>\n\n<p>This new Almaraz I and II project is located next to the 100 MWp Campo Ara\u00f1uelo I-II Photovoltaic Plant, built by Eiffage Energ\u00eda.<\/p>\n\n<p>It consists of two photovoltaic plants, each with 50 MW of power, on a 210 hectare site with 259,680 modules.<\/p>\n\n<p>These two projects, which will prevent atmospheric emissions of 37,000 tons of CO2 per year, will supply clean energy to about 65,000 people.<\/p>\n\n<h3 class=\"wp-block-heading\" id=\"planta-solar-ceclavin-y-pizarro\"><strong>Ceclav\u00edn and Pizarro Solar Farm<\/strong><\/h3>\n\n<p>Still in Extremadura,\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/\">Eiffage Energ\u00eda<\/a>\u00a0built the Ceclav\u00edn photovoltaic plant under a BOP arrangement. This plant has an installed power of 328 MW and was commissioned by\u00a0<a href=\"https:\/\/www.iberdrola.es\/\">Iberdrola<\/a>\u00a0in C\u00e1ceres.<\/p>\n\n<p>This project will prevent atmospheric emissions of 110,000 tonnes of CO2 per year and provides green energy to around 210,000 people.<\/p>\n\n<p>Eiffage Energ\u00eda is also involved in the construction of the 590 MW Francisco Pizarro photovoltaic plant, located in C\u00e1ceres, between the local districts of Aldeacentenera and Torrecillas de la Tiesa, owned by the Iberdrola group.<\/p>\n\n<p>The project, on a 827 hectare site, will be the largest in Europe when it comes into operation. It will supply clean energy to 375,000 people per year, which is equivalent to the populations of the cities of C\u00e1ceres and Badajoz, and its product will avoid atmospheric emissions of 245,000 tonnes of CO2.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"427\" data-id=\"43723\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-11.jpeg\" alt=\"\" class=\"wp-image-43723\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-11.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-11-300x125.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-11-768x320.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"43721\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-9.jpeg\" alt=\"\" class=\"wp-image-43721\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-9.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-9-300x300.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-9-150x150.jpeg 150w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-9-768x768.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"43719\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-8.jpeg\" alt=\"\" class=\"wp-image-43719\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-8.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-8-300x300.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-8-150x150.jpeg 150w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-8-768x768.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"777\" data-id=\"43715\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-2.jpg\" alt=\"\" class=\"wp-image-43715\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-2.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-2-300x228.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-2-768x583.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" data-id=\"43713\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II.jpg\" alt=\"\" class=\"wp-image-43713\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-300x300.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-150x150.jpg 150w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/Almaraz-II-768x768.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We have recently started work on the Almaraz I and II photovoltaic plant for Iberdrola in the province of C\u00e1ceres, which is scheduled for completion next summer. Eiffage Energ\u00eda is the company responsible for the engineering, construction, non-core supplies, assembly and commissioning of the plant, with a budget of over 9 million euros. The plant &#8230; <a title=\"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/\" aria-label=\"Read more about We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43717,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[856],"tags":[],"class_list":["post-43779","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"og:description\" content=\"We have recently started work on the Almaraz I and II photovoltaic plant for Iberdrola in the province of C\u00e1ceres, which is scheduled for completion next summer. Eiffage Energ\u00eda is the company responsible for the engineering, construction, non-core supplies, assembly and commissioning of the plant, with a budget of over 9 million euros. The plant ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-09T10:33:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-02-11T13:31:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Vanessa Landete\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/\"},\"author\":{\"name\":\"Vanessa Landete\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/ee0b6cef257519e591618399167038ad\"},\"headline\":\"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres\",\"datePublished\":\"2022-02-09T10:33:33+00:00\",\"dateModified\":\"2022-02-11T13:31:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/\"},\"wordCount\":558,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/almaraz-extremadura-3.jpeg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/\",\"name\":\"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/almaraz-extremadura-3.jpeg\",\"datePublished\":\"2022-02-09T10:33:33+00:00\",\"dateModified\":\"2022-02-11T13:31:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/almaraz-extremadura-3.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/02\\\/almaraz-extremadura-3.jpeg\",\"width\":1024,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/02\\\/09\\\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/ee0b6cef257519e591618399167038ad\",\"name\":\"Vanessa Landete\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/vlandete\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/","og_locale":"en_US","og_type":"article","og_title":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas","og_description":"We have recently started work on the Almaraz I and II photovoltaic plant for Iberdrola in the province of C\u00e1ceres, which is scheduled for completion next summer. Eiffage Energ\u00eda is the company responsible for the engineering, construction, non-core supplies, assembly and commissioning of the plant, with a budget of over 9 million euros. The plant ... Read more","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2022-02-09T10:33:33+00:00","article_modified_time":"2022-02-11T13:31:17+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg","type":"image\/jpeg"}],"author":"Vanessa Landete","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/"},"author":{"name":"Vanessa Landete","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/ee0b6cef257519e591618399167038ad"},"headline":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres","datePublished":"2022-02-09T10:33:33+00:00","dateModified":"2022-02-11T13:31:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/"},"wordCount":558,"commentCount":0,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/","name":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres - Eiffage Energ\u00eda Sistemas","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg","datePublished":"2022-02-09T10:33:33+00:00","dateModified":"2022-02-11T13:31:17+00:00","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/02\/almaraz-extremadura-3.jpeg","width":1024,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/02\/09\/we-have-started-work-on-the-almaraz-i-and-ii-photovoltaic-plant-for-iberdrola-in-caceres\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"We have started work on the Almaraz I and II Photovoltaic Plant for Iberdrola in C\u00e1ceres"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/ee0b6cef257519e591618399167038ad","name":"Vanessa Landete","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/vlandete\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43779","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=43779"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/43779\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/43717"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=43779"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=43779"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=43779"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}