{"id":48803,"date":"2022-10-11T10:25:24","date_gmt":"2022-10-11T08:25:24","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/"},"modified":"2022-10-18T10:10:29","modified_gmt":"2022-10-18T08:10:29","slug":"official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/","title":{"rendered":"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca"},"content":{"rendered":"\n<p>The President of Castilla-La Mancha, Emiliano Garc\u00eda-Page, has officially opened the \u201cEl Monte\u201d wind farm, previously known as\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2021\/04\/07\/eiffage-energia-begins-work-on-the-cuevas-de-velasco-wind-farm-in-cuenca\/\">Cuevas de Velasco<\/a>, built by Eiffage Energ\u00eda Sistemas in Torrejoncillo del Rey (Cuenca). This project is the result of a partnership with Azora Capital, Plenitude\u2019s strategic partner in Spain for the development of renewable energy projects.<\/p>\n\n<p>The 104.5 MW wind farm is now fully operational. It consists of a total of 19 GE Cypress 158 wind turbines, with the largest unit size (5.5MW) installed in Spain. This facility will produce over 300,000 MWh per year, equivalent to the domestic consumption of 100,000 households.<\/p>\n\n<p>Eiffage Energ\u00eda was responsible for constructing the accesses; internal roads; installation platforms; foundations; drainage; cable trenches; medium voltage network; communications; and grounding.<\/p>\n\n<h3 class=\"wp-block-heading\">Evacuation system<\/h3>\n\n<p>We also built the\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/?p=47980\">evacuation system<\/a>\u00a0associated with the Cuevas de Velasco wind farm, consisting of:<\/p>\n\n<p>-The \u201cVillar del \u00c1guila\u201d 220\/30kV substation. This consists of a Line-Transformer position and an ONAN\/ONAF 90\/120 MW power transformer.<\/p>\n\n<p>-A 220kV overhead line. Originating at the \u201cVillar del \u00c1guila\u201d substation and ending at the \u201cVillares del Saz\u201d substation, owned by Red El\u00e9ctrica Espa\u00f1ola. The estimated length of this evacuation line is 13.640 km.<\/p>\n\n<p>-A 220kV Metering Centre, adjoining the \u201cVillares del Saz\u201d substation. It will have voltage and current transformers with similar characteristics to those installed at the Villar del \u00c1guila substation for use as a boundary point with<a href=\"https:\/\/www.ree.es\/es\"> Red El\u00e9ctrica Espa\u00f1ola<\/a>.<\/p>\n\n<h3 class=\"wp-block-heading\">Sustainable project<\/h3>\n\n<p>The regional president praised the facility for creating \u201cemployment and income\u201d, as well as for its \u201ccontribution to overall sustainability\u201d.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/p1gf0knhks19sotn91ma6r0kpfja-1024x684.jpg\" alt=\"\" class=\"wp-image-48531\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/p1gf0knhks19sotn91ma6r0kpfja-1024x684.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/p1gf0knhks19sotn91ma6r0kpfja-300x200.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/p1gf0knhks19sotn91ma6r0kpfja-768x513.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/p1gf0knhks19sotn91ma6r0kpfja.jpg 1228w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n<p>\u201cCastilla-La Mancha is going to produce much more clean energy than we can use and on top of that we just feed it into the national grid\u201d. In the regional president\u2019s opinion, this energy model serves to \u201cunderstand what it means to be a nation and to all be in it together, where we share both problems and their solutions\u201d.<\/p>\n\n<p>The project also promotes the creation of direct and indirect local employment and will contribute to the progressive decarbonisation of the electricity sector in Spain.<\/p>\n\n<p><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48587\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67.png\" alt=\"\" class=\"wp-image-48587\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-67-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48590\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26.png\" alt=\"\" class=\"wp-image-48590\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-26-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48592\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19.png\" alt=\"\" class=\"wp-image-48592\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-19-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48582\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65.png\" alt=\"\" class=\"wp-image-48582\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-65-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48584\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71.png\" alt=\"\" class=\"wp-image-48584\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-71-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48586\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5.png\" alt=\"\" class=\"wp-image-48586\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-5-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48594\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27.png\" alt=\"\" class=\"wp-image-48594\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-27-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48596\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31.png\" alt=\"\" class=\"wp-image-48596\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-31-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48598\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51.png\" alt=\"\" class=\"wp-image-48598\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-51-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48600\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55.png\" alt=\"\" class=\"wp-image-48600\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-55-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1440\" data-id=\"48602\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45.png\" alt=\"\" class=\"wp-image-48602\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45.png 2560w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45-300x169.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45-1024x576.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45-768x432.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45-1536x864.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/cuevas-de-velasco-45-2048x1152.png 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure><figcaption class=\"blocks-gallery-caption\">Fuente: El Peri\u00f3dico de la Energ\u00eda:  <a href=\"https:\/\/www.youtube.com\/watch?v=1Pls6PGfpyI\">(16) Plenitude inaugura el parque e\u00f3lico El Monte, donde se sit\u00faan las mayores turbinas de Espa\u00f1a &#8211; YouTube<\/a><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The President of Castilla-La Mancha, Emiliano Garc\u00eda-Page, has officially opened the \u201cEl Monte\u201d wind farm, previously known as\u00a0Cuevas de Velasco, built by Eiffage Energ\u00eda Sistemas in Torrejoncillo del Rey (Cuenca). This project is the result of a partnership with Azora Capital, Plenitude\u2019s strategic partner in Spain for the development of renewable energy projects. The 104.5 &#8230; <a title=\"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/\" aria-label=\"Read more about Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":48530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1941,1435],"tags":[1952,1915,1949,1436,1441],"class_list":["post-48803","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-sistemas-en","category-renewable-energies","tag-el-monte-wind-farm","tag-castilla-la-mancha-en-4","tag-eiffage-energia-sistemas-en","tag-energia-eolica-en-2","tag-renewable-energies"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca<\/title>\n<meta name=\"description\" content=\"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca\" \/>\n<meta property=\"og:description\" content=\"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-11T08:25:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-18T08:10:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Mart\u00ednez Garc\u00eda\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/\"},\"author\":{\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\"},\"headline\":\"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca\",\"datePublished\":\"2022-10-11T08:25:24+00:00\",\"dateModified\":\"2022-10-18T08:10:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/\"},\"wordCount\":387,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg\",\"keywords\":[\"\u201cEl Monte\u201d Wind Farm\",\"Castilla-La Mancha\",\"Eiffage Energ\u00eda Sistemas\",\"energ\u00eda e\u00f3lica\",\"Renewable Energies\"],\"articleSection\":[\"Eiffage Energ\u00eda Sistemas\",\"Renewable Energies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/\",\"name\":\"Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg\",\"datePublished\":\"2022-10-11T08:25:24+00:00\",\"dateModified\":\"2022-10-18T08:10:29+00:00\",\"description\":\"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg\",\"width\":1600,\"height\":1200,\"caption\":\"Parque E\u00f3lico \\\"El Monte\\\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2022\\\/10\\\/11\\\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/2772ce374ce489b52082e05008fba6bf\",\"name\":\"Cristina Mart\u00ednez Garc\u00eda\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristina\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca","description":"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/","og_locale":"en_US","og_type":"article","og_title":"Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca","og_description":"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2022-10-11T08:25:24+00:00","article_modified_time":"2022-10-18T08:10:29+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg","type":"image\/jpeg"}],"author":"Cristina Mart\u00ednez Garc\u00eda","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/"},"author":{"name":"Cristina Mart\u00ednez Garc\u00eda","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf"},"headline":"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca","datePublished":"2022-10-11T08:25:24+00:00","dateModified":"2022-10-18T08:10:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/"},"wordCount":387,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg","keywords":["\u201cEl Monte\u201d Wind Farm","Castilla-La Mancha","Eiffage Energ\u00eda Sistemas","energ\u00eda e\u00f3lica","Renewable Energies"],"articleSection":["Eiffage Energ\u00eda Sistemas","Renewable Energies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/","name":"Official opening of the \u201cEl Monte\u201d Wind Farm in Cuenca","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg","datePublished":"2022-10-11T08:25:24+00:00","dateModified":"2022-10-18T08:10:29+00:00","description":"The President of Castilla-La Mancha, has officially opened the \u201cEl Monte\u201d wind farm, in Torrejoncillo del Rey (Cuenca).","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/10\/e9150464-5f9b-4727-83c8-2bc0fa4adfb7.jpg","width":1600,"height":1200,"caption":"Parque E\u00f3lico \"El Monte\""},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2022\/10\/11\/official-opening-of-the-el-monte-wind-farm-built-by-eiffage-energia-sistemas-in-cuenca\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Official opening of the \u201cEl Monte\u201d Wind Farm built by Eiffage Energ\u00eda Sistemas in Cuenca"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/2772ce374ce489b52082e05008fba6bf","name":"Cristina Mart\u00ednez Garc\u00eda","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristina\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/48803","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=48803"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/48803\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/48530"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=48803"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=48803"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=48803"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}