{"id":50344,"date":"2023-01-16T17:46:54","date_gmt":"2023-01-16T16:46:54","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/"},"modified":"2023-01-23T11:10:25","modified_gmt":"2023-01-23T10:10:25","slug":"eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/","title":{"rendered":"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia"},"content":{"rendered":"\n<p>The Tabernas I and II photovoltaic facilities in Almer\u00eda, which we built for <a href=\"https:\/\/www.naturgy.es\/hogar\">Naturgy.<\/a>, have recently been commissioned.<\/p>\n\n<p>These are Naturgy&#8217;s first solar plants in Andalusia, and they will produce more than 228 GWh of energy per year and contribute to a reduction of over 145,200 tonnes of CO2 per year. <\/p>\n\n<p>Tabernas I and II will also allow the use of other sources of conventional electricity generation to be phased out, thereby contributing to the energy transition process. <\/p>\n\n<h3 class=\"wp-block-heading\"><h3><strong>Civil and Electromechanical Works<\/strong><\/h3><\/h3>\n\n<p>The <a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/business-lines\/renewable-energies\/\">Civil and Electromechanical Works<\/a> departments of Eiffage Energ\u00eda Sistemas were involved in this project.<\/p>\n\n<p>The following equipment was installed:<\/p>\n\n<p>\u2013 186,512 modules with 535 and 540 Wp.<\/p>\n\n<p>\u2013 Over 530,000 linear metres of solar cable (4-6mm2).<\/p>\n\n<p>\u2013 Close to 300,000 metres of LV aluminium XZ1 cable.<\/p>\n\n<p>\u2013 Around 64,000 linear metres of 18\/30KV medium voltage cable.<\/p>\n\n<h3 class=\"wp-block-heading\"><h3><strong>Local employment\u00a0<\/strong><\/h3><\/h3>\n\n<p>These new infrastructures, the construction of which has taken a year, have created more than 700 jobs. Both direct and indirect jobs, during the construction; operation; as well as during the maintenance phase from now on. <\/p>\n\n<p>Priority was given to hiring companies from Almer\u00eda for the development, as well as personnel from nearby towns, such as Tabernas, Sorbas and Lucainena de las Torres.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1173\" height=\"658\" data-id=\"50099\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-15.jpg\" alt=\"\" class=\"wp-image-50099\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1173\" height=\"658\" data-id=\"50097\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-14.jpg\" alt=\"\" class=\"wp-image-50097\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"512\" height=\"287\" data-id=\"50095\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-8.jpg\" alt=\"\" class=\"wp-image-50095\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"512\" height=\"287\" data-id=\"50093\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-6.jpg\" alt=\"\" class=\"wp-image-50093\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"512\" height=\"288\" data-id=\"50091\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-5.jpg\" alt=\"\" class=\"wp-image-50091\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"512\" height=\"230\" data-id=\"50089\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-1.jpg\" alt=\"\" class=\"wp-image-50089\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1173\" height=\"658\" data-id=\"50085\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-16.jpg\" alt=\"\" class=\"wp-image-50085\"\/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Tabernas I and II photovoltaic facilities in Almer\u00eda, which we built for Naturgy., have recently been commissioned. These are Naturgy&#8217;s first solar plants in Andalusia, and they will produce more than 228 GWh of energy per year and contribute to a reduction of over 145,200 tonnes of CO2 per year. Tabernas I and II &#8230; <a title=\"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/\" aria-label=\"Read more about Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":50180,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1941,1450],"tags":[2011,2013,1470,1485,2012,1780],"class_list":["post-50344","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-sistemas-en","category-obra-civil-y-construccion","tag-andalucia-en","tag-electromechanical","tag-energia-fotovoltaica-en","tag-energia-solar-en-2","tag-naturgy-en","tag-public-works"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Tabernas I and II solar plants in Almer\u00eda are underway<\/title>\n<meta name=\"description\" content=\"Tabernas I and II. These are Naturgy&#039;s first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Tabernas I and II solar plants in Almer\u00eda are underway\" \/>\n<meta property=\"og:description\" content=\"Tabernas I and II. These are Naturgy&#039;s first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-16T16:46:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T10:10:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"M Angeles Castellanos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/\"},\"author\":{\"name\":\"M Angeles Castellanos\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\"},\"headline\":\"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia\",\"datePublished\":\"2023-01-16T16:46:54+00:00\",\"dateModified\":\"2023-01-23T10:10:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/\"},\"wordCount\":212,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/tabernas-17.jpeg\",\"keywords\":[\"Andaluc\u00eda\",\"Electromechanical\",\"energia fotovoltaica\",\"Energ\u00eda Solar\",\"Naturgy\",\"public works\"],\"articleSection\":[\"Eiffage Energ\u00eda Sistemas\",\"Obra Civil y Construcci\u00f3n\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/\",\"name\":\"The Tabernas I and II solar plants in Almer\u00eda are underway\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/tabernas-17.jpeg\",\"datePublished\":\"2023-01-16T16:46:54+00:00\",\"dateModified\":\"2023-01-23T10:10:25+00:00\",\"description\":\"Tabernas I and II. These are Naturgy's first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/tabernas-17.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/tabernas-17.jpeg\",\"width\":2048,\"height\":1536},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/01\\\/16\\\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\",\"name\":\"M Angeles Castellanos\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/mangelescastellanos\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Tabernas I and II solar plants in Almer\u00eda are underway","description":"Tabernas I and II. These are Naturgy's first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/","og_locale":"en_US","og_type":"article","og_title":"The Tabernas I and II solar plants in Almer\u00eda are underway","og_description":"Tabernas I and II. These are Naturgy's first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2023-01-16T16:46:54+00:00","article_modified_time":"2023-01-23T10:10:25+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg","type":"image\/jpeg"}],"author":"M Angeles Castellanos","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/"},"author":{"name":"M Angeles Castellanos","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8"},"headline":"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia","datePublished":"2023-01-16T16:46:54+00:00","dateModified":"2023-01-23T10:10:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/"},"wordCount":212,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg","keywords":["Andaluc\u00eda","Electromechanical","energia fotovoltaica","Energ\u00eda Solar","Naturgy","public works"],"articleSection":["Eiffage Energ\u00eda Sistemas","Obra Civil y Construcci\u00f3n"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/","name":"The Tabernas I and II solar plants in Almer\u00eda are underway","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg","datePublished":"2023-01-16T16:46:54+00:00","dateModified":"2023-01-23T10:10:25+00:00","description":"Tabernas I and II. These are Naturgy's first solar plants in Andalusia builds by Eiffage Energ\u00eda Sistemas","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/tabernas-17.jpeg","width":2048,"height":1536},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/01\/16\/eiffage-energia-sistemas-builds-the-first-photovoltaic-facilities-to-be-commissioned-by-naturgy-in-andalusia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage Energ\u00eda Sistemas builds the first photovoltaic facilities to be commissioned by Naturgy in Andalusia"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8","name":"M Angeles Castellanos","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/mangelescastellanos\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/50344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=50344"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/50344\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/50180"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=50344"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=50344"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=50344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}