{"id":52989,"date":"2023-07-11T09:09:35","date_gmt":"2023-07-11T07:09:35","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/"},"modified":"2023-07-13T08:08:14","modified_gmt":"2023-07-13T06:08:14","slug":"eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/","title":{"rendered":"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra"},"content":{"rendered":"\n<p><a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/\">Eiffage Energ\u00eda Sistemas<\/a> has built the Encamp-Grau Roig high-voltage line for <a href=\"https:\/\/www.feda.ad\">Fuerzas El\u00e9ctricas de Andorra<\/a>, which will triple Andorra\u2019s electricity transmission capacity.<\/p>\n\n<p>This allows Fuerzas El\u00e9ctricas de Andorra to meet the demand and growth of Andorra and to provide a service to new facilities, hotels, homes and ski resorts.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Andorra&#8217;s energy transition<\/strong><\/h3>\n\n<p>As a result, it will be able to accommodate the growth resulting from the conversion from oil to electric heating, as well as the increase in electric mobility, among other factors. As part of the energy transition, FEDA&#8217;s aim is precisely to promote decarbonization and more sustainable mobility.<\/p>\n\n<p>The new route is 17.5 kilometres long and has 71 pylons, all of which are located away from urban centres and on public land.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Scope of the project<\/strong><\/h3>\n\n<p>The work consists of a new line, consisting of 69 towers, 2 x 110KV circuits, plus fibre optics.<\/p>\n\n<p>Some 30 Eiffage Energ\u00eda Sistemas employees were involved in this project, as well as 10 employees from the Eiffage Group in France, and others through subcontractors.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Sustainability<\/strong><\/h3>\n\n<p>It is worth highlighting the important work carried out in the area of sustainability, given that Andorra is a country in the heart of the Pyrenees and everything related to environmental impact has a special connotation. <\/p>\n\n<p>For this reason, work has been done on waste collection and the control of any type of paper or waste. Smoking has also been banned throughout the construction site, and many other measures have been taken.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"52938\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-1.jpeg\" alt=\"\" class=\"wp-image-52938\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-1.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-1-300x225.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-1-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"52950\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-3.jpeg\" alt=\"\" class=\"wp-image-52950\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-3.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-3-300x225.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-3-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"52954\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-7.jpeg\" alt=\"\" class=\"wp-image-52954\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-7.jpeg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-7-225x300.jpeg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"52946\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-8.jpeg\" alt=\"\" class=\"wp-image-52946\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-8.jpeg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-8-225x300.jpeg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"52948\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-11.jpeg\" alt=\"\" class=\"wp-image-52948\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-11.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-11-300x169.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-11-768x432.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"52951\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-13.jpeg\" alt=\"\" class=\"wp-image-52951\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-13.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-13-300x225.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-13-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"52940\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-14.jpeg\" alt=\"\" class=\"wp-image-52940\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-14.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-14-300x225.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-14-768x576.jpeg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"478\" height=\"1024\" data-id=\"52942\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-17.jpeg\" alt=\"\" class=\"wp-image-52942\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-17.jpeg 478w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-17-140x300.jpeg 140w\" sizes=\"(max-width: 478px) 100vw, 478px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"52943\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-18.jpeg\" alt=\"\" class=\"wp-image-52943\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-18.jpeg 576w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Andorra-18-169x300.jpeg 169w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Eiffage Energ\u00eda Sistemas has built the Encamp-Grau Roig high-voltage line for Fuerzas El\u00e9ctricas de Andorra, which will triple Andorra\u2019s electricity transmission capacity. This allows Fuerzas El\u00e9ctricas de Andorra to meet the demand and growth of Andorra and to provide a service to new facilities, hotels, homes and ski resorts. Andorra&#8217;s energy transition As a result, &#8230; <a title=\"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/\" aria-label=\"Read more about Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":52936,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1630],"tags":[1457,2153,1617,2155,2154,1971],"class_list":["post-52989","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-installations","tag-alta-tension-en-2","tag-andorra-en","tag-decarbonization","tag-electric-mobility","tag-electric-power","tag-energy-transition"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>the Encamp-Grau Roig high-voltage line in Andorra<\/title>\n<meta name=\"description\" content=\"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"the Encamp-Grau Roig high-voltage line in Andorra\" \/>\n<meta property=\"og:description\" content=\"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-11T07:09:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-13T06:08:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"M Angeles Castellanos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/\"},\"author\":{\"name\":\"M Angeles Castellanos\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\"},\"headline\":\"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra\",\"datePublished\":\"2023-07-11T07:09:35+00:00\",\"dateModified\":\"2023-07-13T06:08:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/\"},\"wordCount\":259,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg\",\"keywords\":[\"alta tensi\u00f3n\",\"Andorra\",\"Decarbonization\",\"electric mobility\",\"electric power\",\"Energy transition\"],\"articleSection\":[\"electrical installations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/\",\"name\":\"the Encamp-Grau Roig high-voltage line in Andorra\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg\",\"datePublished\":\"2023-07-11T07:09:35+00:00\",\"dateModified\":\"2023-07-13T06:08:14+00:00\",\"description\":\"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg\",\"width\":1024,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/11\\\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\",\"name\":\"M Angeles Castellanos\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/mangelescastellanos\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"the Encamp-Grau Roig high-voltage line in Andorra","description":"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/","og_locale":"en_US","og_type":"article","og_title":"the Encamp-Grau Roig high-voltage line in Andorra","og_description":"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2023-07-11T07:09:35+00:00","article_modified_time":"2023-07-13T06:08:14+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg","type":"image\/jpeg"}],"author":"M Angeles Castellanos","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/"},"author":{"name":"M Angeles Castellanos","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8"},"headline":"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra","datePublished":"2023-07-11T07:09:35+00:00","dateModified":"2023-07-13T06:08:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/"},"wordCount":259,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg","keywords":["alta tensi\u00f3n","Andorra","Decarbonization","electric mobility","electric power","Energy transition"],"articleSection":["electrical installations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/","name":"the Encamp-Grau Roig high-voltage line in Andorra","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg","datePublished":"2023-07-11T07:09:35+00:00","dateModified":"2023-07-13T06:08:14+00:00","description":"Andorra. Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line which will triple Andorra\u2019s electricity transmission capacity.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/Linea-de-Alta-Tension-Encamp-Grau-Roig-en-Andorra.jpg","width":1024,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/11\/eiffage-energia-sistemas-builds-the-encamp-grau-roig-high-voltage-line-in-andorra\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage Energ\u00eda Sistemas builds the Encamp-Grau Roig High Voltage line in Andorra"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8","name":"M Angeles Castellanos","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/mangelescastellanos\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/52989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=52989"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/52989\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/52936"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=52989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=52989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=52989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}