{"id":53349,"date":"2023-07-19T10:10:10","date_gmt":"2023-07-19T08:10:10","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/"},"modified":"2023-08-09T14:45:14","modified_gmt":"2023-08-09T12:45:14","slug":"reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/","title":{"rendered":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces"},"content":{"rendered":"\n<p>Palma de Mallorca.\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/\">Eiffage Energ\u00eda Sistemas<\/a>\u00a0is going to undertake, through the Facilities Department of the Eastern Zone, the retrofitting works of a multipurpose building, located at Calle Felici\u00e0 Fuster, 7 in Palma de Mallorca. It is a building belonging to the\u00a0<a href=\"https:\/\/mpt.gob.es\/index.html\">Ministry of Territorial Policy and Public Function.<\/a><\/p>\n\n<p>The work to be carried out is aimed at rectifying the existing deficiencies, especially with regard to the installations. Yet without overlooking any pathology such as humidities, fissures or cracks in the partitions and coatings.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Scope of the project<\/strong><\/h3>\n\n<p>The building consists of a Ground floor, First floor, Second floor and Roof. It has a constructed surface area of 7,387.97 m2.<\/p>\n\n<p>Eiffage Energ\u00eda Sistemas will carry out the following works:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Removal of the old air conditioning, including machines and ducts, as well as the accumulators associated with the existing solar panels. <\/li>\n\n\n\n<li>Installation of a new air conditioning and centralised ventilation system. A network that will significantly improve the comfort and energy efficiency of the building.<\/li>\n\n\n\n<li>Refurbishment of part of the electrical system; and replacement of obsolete lighting fixtures with more modern and efficient ones.<\/li>\n\n\n\n<li>Installation of a new fire protection network in all areas of the building. This installation is to ensure the safety of the occupants in case of emergency.<\/li>\n\n\n\n<li>Implementation of a new plumbing and sanitary hot water network, complemented by a control centre and hypochlorite dosing equipment to maintain high hygiene standards.<\/li>\n\n\n\n<li>Supply and installation of new false ceilings and wall linings, which will not only improve the visual appearance of the building, but will also contribute to its thermal and acoustic insulation.<\/li>\n\n\n\n<li>Provision and installation of state-of-the-art fire doors to ensure the safety of people and property in case of fire.<\/li>\n<\/ul>\n\n<h3 class=\"wp-block-heading\"><strong>Experience<\/strong><\/h3>\n\n<p>More than 25 years\u2019 experience in the integral installations sector, a team of highly qualified professionals and the confidence of being part of a large group are the guarantee that Eiffage Energ\u00eda Sistemas can carry out any type of installation in public and administrative buildings.<\/p>\n\n<p>Our teams of multidisciplinary professionals manage projects involving all types of electrical, mechanical and special installations, working for a leading company, both in the execution of large or single projects, thanks to the Group\u2019s great technical and economic capacity, and in all types of smaller installations and projects, where our large infrastructure and extensive network of branches allow us to carry them out at very competitive prices, offering our customers a very close and high quality service.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"945\" height=\"835\" data-id=\"53102\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-1.png\" alt=\"\" class=\"wp-image-53102\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-1.png 945w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-1-300x265.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-1-768x679.png 768w\" sizes=\"(max-width: 945px) 100vw, 945px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"494\" data-id=\"53104\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2-1024x494.png\" alt=\"\" class=\"wp-image-53104\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2-1024x494.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2-300x145.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2-768x370.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png 1273w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"350\" data-id=\"53106\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3-1024x350.png\" alt=\"\" class=\"wp-image-53106\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3-1024x350.png 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3-300x103.png 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3-768x263.png 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3-1536x525.png 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-3.png 1606w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Palma de Mallorca.\u00a0Eiffage Energ\u00eda Sistemas\u00a0is going to undertake, through the Facilities Department of the Eastern Zone, the retrofitting works of a multipurpose building, located at Calle Felici\u00e0 Fuster, 7 in Palma de Mallorca. It is a building belonging to the\u00a0Ministry of Territorial Policy and Public Function. The work to be carried out is aimed at &#8230; <a title=\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/\" aria-label=\"Read more about Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":53105,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1932],"tags":[1949,1565],"class_list":["post-53349","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-refurbishment","tag-eiffage-energia-sistemas-en","tag-reforms"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reform of facilities in a public building in Palma de Mallorca<\/title>\n<meta name=\"description\" content=\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reform of facilities in a public building in Palma de Mallorca\" \/>\n<meta property=\"og:description\" content=\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-19T08:10:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-08-09T12:45:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1273\" \/>\n\t<meta property=\"og:image:height\" content=\"614\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"M Angeles Castellanos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/\"},\"author\":{\"name\":\"M Angeles Castellanos\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\"},\"headline\":\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\",\"datePublished\":\"2023-07-19T08:10:10+00:00\",\"dateModified\":\"2023-08-09T12:45:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/\"},\"wordCount\":425,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/reforma-edificio-politica-territorial-mallorca-2.png\",\"keywords\":[\"Eiffage Energ\u00eda Sistemas\",\"reforms\"],\"articleSection\":[\"Refurbishment\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/\",\"name\":\"Reform of facilities in a public building in Palma de Mallorca\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/reforma-edificio-politica-territorial-mallorca-2.png\",\"datePublished\":\"2023-07-19T08:10:10+00:00\",\"dateModified\":\"2023-08-09T12:45:14+00:00\",\"description\":\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/reforma-edificio-politica-territorial-mallorca-2.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/reforma-edificio-politica-territorial-mallorca-2.png\",\"width\":1273,\"height\":614},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/07\\\/19\\\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\",\"name\":\"M Angeles Castellanos\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/mangelescastellanos\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Reform of facilities in a public building in Palma de Mallorca","description":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/","og_locale":"en_US","og_type":"article","og_title":"Reform of facilities in a public building in Palma de Mallorca","og_description":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2023-07-19T08:10:10+00:00","article_modified_time":"2023-08-09T12:45:14+00:00","og_image":[{"width":1273,"height":614,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png","type":"image\/png"}],"author":"M Angeles Castellanos","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/"},"author":{"name":"M Angeles Castellanos","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8"},"headline":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces","datePublished":"2023-07-19T08:10:10+00:00","dateModified":"2023-08-09T12:45:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/"},"wordCount":425,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png","keywords":["Eiffage Energ\u00eda Sistemas","reforms"],"articleSection":["Refurbishment"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/","name":"Reform of facilities in a public building in Palma de Mallorca","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png","datePublished":"2023-07-19T08:10:10+00:00","dateModified":"2023-08-09T12:45:14+00:00","description":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/07\/reforma-edificio-politica-territorial-mallorca-2.png","width":1273,"height":614},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/07\/19\/reform-of-facilities-in-a-public-building-in-palma-de-mallorca-eiffage-energia-sistemas-transforming-spaces\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Reform of facilities in a public building in Palma de Mallorca: Eiffage Energ\u00eda Sistemas, transforming spaces"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8","name":"M Angeles Castellanos","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/mangelescastellanos\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/53349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=53349"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/53349\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/53105"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=53349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=53349"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=53349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}