{"id":53363,"date":"2023-08-08T08:59:28","date_gmt":"2023-08-08T06:59:28","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/"},"modified":"2024-03-12T14:05:29","modified_gmt":"2024-03-12T13:05:29","slug":"photovoltaics-gain-ground-from-spain-to-latin-america","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/","title":{"rendered":"Photovoltaics gain ground from Spain to Latin America"},"content":{"rendered":"\n<p><strong>2022 was a successful year for Eiffage Energ\u00eda Sistemas in both Spain and South America, with a record number of wind and photovoltaic plants built, exceeding 1 GW of installed capacity.<\/strong><\/p>\n\n<p>Notable projects include<a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2021\/09\/01\/statkraf-entrusts-eiffage-energia-with-the-construction-of-four-234mw-solar-farms-in-cadiz\/\"> Arcos<\/a> (233 MW) and Pizarro (200 MW), which confirm our consolidation in Spain while we develop our activities in South America. Last year, we completed two major projects in Chile:\u00a0<a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/projects\/p-s-f-v-domeyko\/\">Domeyko<\/a>\u00a0and Guanchoi, with 204 MW and 174 MW of installed power respectively.<\/p>\n\n<p><em>\u201cThe market on this continent is developing rapidly. Activity in South America is decreasing in the countries that are more mature in these technologies, such as Chile and Mexico\u201d, <\/em>says Jos\u00e9 Ignacio Rodr\u00edguez Vera, director of solar construction in the renewable energy department.\u00a0<em>\u201cBut new countries such as Peru and Colombia are accelerating their transition and embarking on ambitious projects\u201d.<\/em><\/p>\n\n<h3 class=\"wp-block-heading\"><strong>A growing market<\/strong><\/h3>\n\n<p><em>\u201cRapid intercontinental expansion is due to a demand for renewable energy. Growth is not slowing down. There is a fundamental movement in favour of non-conventional energy, especially solar energy\u201d, <\/em>explains\u00a0<a href=\"https:\/\/www.linkedin.com\/in\/jos&#xE9;-ignacio-rodr&#xED;guez-vera-7682b730?miniProfileUrn=urn:li:fs_miniProfile:ACoAAAZzhoABQiOLx-NnINpxpexBmgDEAy9-9Xc&amp;lipi=urn:li:page:d_flagship3_search_srp_all;XBZCifsNQPeFSyBCRav8cA==\">Jos\u00e9 Ignacio Rodr\u00edguez Vera<\/a>. \u201c<em>In just a few years, we have gone from developing projects with a capacity of less than 1GW in Europe to projects of several tens of GW<\/em>\u201d<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"53154\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-1024x768.jpg\" alt=\"\" class=\"wp-image-53154\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-1536x1152.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI-1-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"53157\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-1024x768.jpg\" alt=\"\" class=\"wp-image-53157\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-1536x1152.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-4b-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"53159\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-1024x768.jpg\" alt=\"\" class=\"wp-image-53159\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-1536x1152.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/06\/GUANCHOI2-9b-2048x1536.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p>Eiffage Energ\u00eda Sistemas participates in renewable energy projects in Spain,\u00a0Chile, Colombia, Jamaica, Peru, France and Portugal, covering the entire value chain. From preliminary studies to installation, maintenance, connection to substations and technical support for customers. This global experience allows us to see the future more clearly.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"52453\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-1024x683.jpg\" alt=\"\" class=\"wp-image-52453\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-1024x683.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-300x200.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-768x512.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-1536x1024.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/05\/visita-turroneros-ies-9b-2048x1365.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"50644\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16-1024x576.jpeg\" alt=\"\" class=\"wp-image-50644\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16-1024x576.jpeg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16-300x169.jpeg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16-768x432.jpeg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16-1536x864.jpeg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/EL-TOMILLAR-16.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"2048\" height=\"1367\" data-id=\"49996\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/01\/visita-belinchon-040.jpg\" alt=\"\" class=\"wp-image-49996\"\/><\/figure>\n<\/figure>\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>New ambitions<\/strong><\/h3>\n\n<p>Over the next few years, Eiffage Energ\u00eda Sistemas expects strong growth, driven in particular by the development of our customer portfolio and the performance of our solar and wind facilities. And we are looking to the future.\u00a0<em>\u201cA five-year strategic plan sets out very clear general, commercial and economic objectives. This plan includes a comprehensive analysis of our SWOT (Strengths, Weaknesses, Opportunities, and Threats) in order to identify the actions needed to achieve them,\u201d <\/em>emphasises the solar construction manager<em>.<\/em><\/p>\n\n<p>Our aim is to set ourselves apart through our competitive prices, lead times and the quality of our work.\u00a0<em>\u201cOnce again this year, we have gained a great deal of experience and are better able to analyse our customers&#8217; needs, which is an asset for the future.\u201d<\/em><\/p>\n\n<p>The reduction in CO\u2082 emissions generated by these new facilities is an achievement of which we are proud. A key example of this is the Arcos project, which will avoid the emission of 120,000 tonnes of carbon per year.<\/p>\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p class=\"has-medium-font-size\">Feature Proyect:<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/2022\/02\/09\/comenzamos-las-obras-de-la-planta-fotovoltaica-almaraz-i-y-ii-para-iberdrola-en-caceres\/\" target=\"_blank\" rel=\"noreferrer noopener\">Almaraz<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: provincia de C\u00e1ceres, Espa\u00f1a<br\/>&#x27a1;&#xfe0f; Cliente: Iberdrola<br\/>&#x1f5d3;&#xfe0f; Entrega: 4\u00ba trimestre 2022<br\/>&#x1f4b6;Presupuesto: 9 millones de euros<br\/>&#x26a1;&#xfe0f; Potencia instalada: 79,91 MWp (49,93 MWp por Almaraz I y 29,98 MWp por Almaraz II)<br\/>&#x2795; Aportando la ingenier\u00eda, construcci\u00f3n y puesta en marcha de la central.<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/2021\/09\/01\/statkraf-confia-a-eiffage-energia-la-construccion-de-cuatro-parques-fotovoltaicos-en-cadiz-de-234-mw\/\" target=\"_blank\" rel=\"noreferrer noopener\">Arcos<\/a>:<\/strong><br\/>&#x1f4cd; Localizaci\u00f3n: provincia de C\u00e1diz, Espa\u00f1a<br\/>&#x27a1;&#xfe0f; Cliente: Statkraft<br\/>&#x1f5d3;&#xfe0f; Entrega: 2022<br\/>&#x26a1;&#xfe0f; Potencia instalada: 233 MW<br\/>&#x2795; Las 4 instalaciones <em>in situ<\/em> producir\u00e1n 500 GW\/h de energ\u00eda limpia al a\u00f1o, suficiente para evitar la emisi\u00f3n de 120.000 toneladas de CO\u2082 anuales.<\/p>\n\n<p><strong>Canredondo<\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: provincia de Guadalajara, Espa\u00f1a<br\/>&#x27a1;&#xfe0f; Cliente: <a href=\"https:\/\/www.naturgy.com\/conocenos-naturgy\/la-energia\/renovables\/\" target=\"_blank\" rel=\"noreferrer noopener\">Naturgy<\/a><br\/>&#x1f5d3;&#xfe0f; Entrega: febrero de 2022<br\/>&#x1f4b6; Presupuesto: 5,6 millones de euros<br\/>&#x26a1;&#xfe0f; Potencia instalada: 20 MWp<\/p>\n\n<p><strong><a href=\"https:\/\/www.linkedin.com\/feed\/update\/urn:li:activity:7057710966439862275?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A7057710966439862275%29\" target=\"_blank\" rel=\"noreferrer noopener\">Clemes\u00ed<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: Per\u00fa<br\/>&#x27a1;&#xfe0f; Cliente: de Enel<br\/>&#x1f5d3;&#xfe0f; Entrega: Diciembre 2022<br\/>&#x26a1;&#xfe0f; Potencia instalada: 130 MW<br\/>&#x2795; Combinado con la central e\u00f3lica de Extensi\u00f3n Wayra, el proyecto evitar\u00e1 la emisi\u00f3n de 385.000 toneladas de CO\u2082.<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/2022\/06\/13\/la-instalacion-fotovoltaica-de-autoconsumo-de-cosentino-en-almeria-entrara-en-funcionamiento-en-unas-semanas\/\" target=\"_blank\" rel=\"noreferrer noopener\">Cosentino<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: provincia de Almer\u00eda, Espa\u00f1a<br\/>&#x27a1;&#xfe0f; Cliente: <a href=\"https:\/\/www.cosentino.com\/es\/?utm_source=google&amp;utm_medium=cpc&amp;utm_campaign=COSENTINO_IBE_ESP_B2B_GEN_SPD_SAP_SEA_BRD_LDS_PRS_AON_GAD_es&amp;utm_content=*General&amp;gclid=Cj0KCQjwrMKmBhCJARIsAHuEAPS1qvsARQIGZ4uanfKqfJC10oZ3H3UWNfpo8oUAsivICK4jJ6ckv0MaAlznEALw_wcB\" target=\"_blank\" rel=\"noreferrer noopener\">Cosentino<\/a><br\/>&#x1f5d3;&#xfe0f; Entrega: 1er trimestre de 2023<br\/>&#x26a1;&#xfe0f;Potencia instalado: 14 MW adicionales en los tejados de las f\u00e1bricas del grupo Cosentino.<br\/>&#x2795; La mayor instalaci\u00f3n fotovoltaica de autoconsumo 100% en Espa\u00f1a.<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/proyecto\/p-s-f-v-domeyko\/\" target=\"_blank\" rel=\"noreferrer noopener\">Domeyko<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: Chile<br\/>&#x27a1;&#xfe0f; Cliente: <a href=\"https:\/\/www.enel.com\/es\" target=\"_blank\" rel=\"noreferrer noopener\">Enel<\/a><br\/>&#x1f5d3;&#xfe0f; Entrega: Octubre 2022<br\/>&#x26a1;&#xfe0f; Potencia instalada: 204 MW<\/p>\n\n<p><strong><a href=\"https:\/\/www.linkedin.com\/feed\/update\/urn:li:activity:7088078312270438400?updateEntityUrn=urn%3Ali%3Afs_feedUpdate%3A%28V2%2Curn%3Ali%3Aactivity%3A7088078312270438400%29\" target=\"_blank\" rel=\"noreferrer noopener\">Guanchoi<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: Chile<br\/>&#x27a1;&#xfe0f;Cliente: Enel<br\/>&#x1f5d3;&#xfe0f; Entrega: 2022<br\/>&#x26a1;&#xfe0f; Potencia instalada: 174 MW<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/2022\/11\/22\/comienza-a-funcionar-la-planta-solar-miraflores-construida-por-eiffage-energia-sistemas-para-naturgy-en-badajoz\/\" target=\"_blank\" rel=\"noreferrer noopener\">Miraflores<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: provincia de Badajoz, Espa\u00f1a<br\/>&#x27a1;&#xfe0f;Cliente: Naturgy<br\/>&#x1f5d3;&#xfe0f; Entrega: febrero 2022<br\/>&#x1f4b6; Presupuesto: 5,6 millones de euros<br\/>&#x26a1;&#xfe0f; Potencia instalada: 22 MW<br\/>&#x2795; El parque fotovoltaico ocupa 33 hect\u00e1reas. Con 4 transformadores, 3 de 6.500 KVA y 1 de 3.250 KVA.<\/p>\n\n<p><strong><a href=\"https:\/\/www.eiffageenergiasistemas.com\/2022\/02\/02\/en-el-primer-trimestre-de-este-ano-se-pondra-en-marcha-la-planta-fotovoltaica-paderne-en-portugal\/\" target=\"_blank\" rel=\"noreferrer noopener\">Paderne<\/a><\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: Portugal<br\/>&#x27a1;&#xfe0f;Cliente: Magnetic Summer<br\/>&#x1f5d3;&#xfe0f; Entrega: 1er trimestre 2022<br\/>&#x1f4b6;Presupuesto: 10 millones de euros<br\/>&#x26a1;&#xfe0f;Potencia instalada: 17,4 MW<br\/>&#x2795; Este parque evitar\u00e1 la emisi\u00f3n de 7.500 toneladas de CO\u2082.<\/p>\n\n<p><strong>Pizarro<\/strong>:<br\/>&#x1f4cd; Localizaci\u00f3n: provincia de C\u00e1ceres, Espa\u00f1a<br\/>&#x27a1;&#xfe0f; Cliente: <a href=\"https:\/\/www.iberdrola.com\/conocenos\/nuestra-empresa\/energias-renovables\" target=\"_blank\" rel=\"noreferrer noopener\">Iberdrola<\/a><br\/>&#x1f5d3;&#xfe0f; Entrega: 1er trimestre 2022<br\/>&#x26a1;&#xfe0f; Potencia instalada: 200 MW<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2022 was a successful year for Eiffage Energ\u00eda Sistemas in both Spain and South America, with a record number of wind and photovoltaic plants built, exceeding 1 GW of installed capacity. Notable projects include Arcos (233 MW) and Pizarro (200 MW), which confirm our consolidation in Spain while we develop our activities in South America. &#8230; <a title=\"Photovoltaics gain ground from Spain to Latin America\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/\" aria-label=\"Read more about Photovoltaics gain ground from Spain to Latin America\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":53317,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1435],"tags":[1954,1485,2159],"class_list":["post-53363","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energies","tag-eiffage-energia-sistemas-en-2","tag-energia-solar-en-2","tag-photovoltaics"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Photovoltaics gain ground from Spain to Latin America<\/title>\n<meta name=\"description\" content=\"Photovoltaics gain ground from Spain to Latin America\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Photovoltaics gain ground from Spain to Latin America\" \/>\n<meta property=\"og:description\" content=\"Photovoltaics gain ground from Spain to Latin America\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-08T06:59:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-03-12T13:05:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1134\" \/>\n\t<meta property=\"og:image:height\" content=\"850\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"M Angeles Castellanos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/\"},\"author\":{\"name\":\"M Angeles Castellanos\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\"},\"headline\":\"Photovoltaics gain ground from Spain to Latin America\",\"datePublished\":\"2023-08-08T06:59:28+00:00\",\"dateModified\":\"2024-03-12T13:05:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/\"},\"wordCount\":872,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/nacho-rodriguez.jpg\",\"keywords\":[\"Eiffage Energia Sistemas\",\"Energ\u00eda Solar\",\"Photovoltaics\"],\"articleSection\":[\"Renewable Energies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/\",\"name\":\"Photovoltaics gain ground from Spain to Latin America\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/nacho-rodriguez.jpg\",\"datePublished\":\"2023-08-08T06:59:28+00:00\",\"dateModified\":\"2024-03-12T13:05:29+00:00\",\"description\":\"Photovoltaics gain ground from Spain to Latin America\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/nacho-rodriguez.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/nacho-rodriguez.jpg\",\"width\":1134,\"height\":850},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2023\\\/08\\\/08\\\/photovoltaics-gain-ground-from-spain-to-latin-america\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Photovoltaics gain ground from Spain to Latin America\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/26294684e9df7fe7e188bf248b55daa8\",\"name\":\"M Angeles Castellanos\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/mangelescastellanos\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Photovoltaics gain ground from Spain to Latin America","description":"Photovoltaics gain ground from Spain to Latin America","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/","og_locale":"en_US","og_type":"article","og_title":"Photovoltaics gain ground from Spain to Latin America","og_description":"Photovoltaics gain ground from Spain to Latin America","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2023-08-08T06:59:28+00:00","article_modified_time":"2024-03-12T13:05:29+00:00","og_image":[{"width":1134,"height":850,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg","type":"image\/jpeg"}],"author":"M Angeles Castellanos","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/"},"author":{"name":"M Angeles Castellanos","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8"},"headline":"Photovoltaics gain ground from Spain to Latin America","datePublished":"2023-08-08T06:59:28+00:00","dateModified":"2024-03-12T13:05:29+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/"},"wordCount":872,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg","keywords":["Eiffage Energia Sistemas","Energ\u00eda Solar","Photovoltaics"],"articleSection":["Renewable Energies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/","name":"Photovoltaics gain ground from Spain to Latin America","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg","datePublished":"2023-08-08T06:59:28+00:00","dateModified":"2024-03-12T13:05:29+00:00","description":"Photovoltaics gain ground from Spain to Latin America","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2023\/08\/nacho-rodriguez.jpg","width":1134,"height":850},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2023\/08\/08\/photovoltaics-gain-ground-from-spain-to-latin-america\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Photovoltaics gain ground from Spain to Latin America"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/26294684e9df7fe7e188bf248b55daa8","name":"M Angeles Castellanos","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/mangelescastellanos\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/53363","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=53363"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/53363\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/53317"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=53363"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=53363"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=53363"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}