{"id":60175,"date":"2025-01-15T11:46:16","date_gmt":"2025-01-15T10:46:16","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/"},"modified":"2025-01-29T11:09:31","modified_gmt":"2025-01-29T10:09:31","slug":"eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/","title":{"rendered":"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda."},"content":{"rendered":"\n<p><a href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/\">Eiffage Energ\u00eda Sistemas <\/a>is to build the Tabernas III photovoltaic plant in Almer\u00eda for <a href=\"https:\/\/www.aquila-clean-energy.es\/\">Aquila Clean Energy<\/a>. This project, with a capacity of 37.50 MW, will generate 76.61 GWh per year, contributing significantly to the production of renewable energy in the region, reaching some 21,000 homes and avoiding some 16,000 tonnes of CO2 emissions into the atmosphere per year.<\/p>\n\n<p>The scope of works includes not only the construction of the plant, but also the feed-in infrastructure necessary to connect to the Red El\u00e9ctrica Espa\u00f1ola grid. The installation will be equipped with advanced technology, such as 2V solar trackers, Trina 615 Wp modules and SUNGrow inverters.<\/p>\n\n<p>In addition, priority will be given to hiring local companies from Almeria during its development. Estimated employment during the construction of the facility is around 170 workers for one year. In the operating phase, approximately 90 direct permanent jobs are estimated.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Environmental measures<\/strong><\/h3>\n\n<p>Environmental measures will be implemented in this project, such as the installation of three ponds and four cairns on the perimeter. Also, 30 nest boxes are to be installed, 10 for bats, 10 for European Rollers and 10 for other birds; 30 shelters for insects; a plant screen is to be planted with native species around the solar plant; a programme for the recovery and conservation of the Linaria nigricans species is to be carried out; and the topsoil containing the seed bank will be conserved.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Other projects for Aquila Clean Energy<\/strong><\/h3>\n\n<p>This plant is in addition to other projects carried out by Eiffage Energ\u00eda Sistemas for Aquila Clean Energy, such as the 27.6 MW Nijarmar photovoltaic plant in Lucainena de las Torres (Almer\u00eda), scheduled to come into operation in the first quarter of 2025.<\/p>\n\n<p>In addition, in 2023, the company completed the 42 MW El Cuco photovoltaic plant in Montealegre del Castillo (Albacete). This facility already supplies clean energy to 19,500 homes per year.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Environmental integration and sustainability<\/strong><\/h3>\n\n<p>In order to promote the ecological transition, Aquila Clean Energy&#8217;s solar power plants include the implementation of measures for the integration and renaturation of the environment.<\/p>\n\n<p>In all the projects carried out for Aquila Clean Energy, Eiffage Energ\u00eda Sistemas has implemented measures that reinforce the sustainability and integration of the plants in their environment. In the case of El Cuco, in Montealegre del Castillo, a plan was developed for crop diversification and rotation, replanting of vegetation under the solar panels, and a plant screen that integrates the installation with the landscape.&#13;\n&#13;\nMeasures were also adopted to protect fauna, such as the compensation of habitats for steppe birds in an area of 72 hectares, the installation of 15 nesting boxes and 3 drinking troughs. These actions reflect the commitment of Eiffage Energ\u00eda Sistemas and Aquila Clean Energy to the ecological transition and preservation of the natural environment.&#13;\n&#13;\nWith Tabernas III, both companies reinforce their commitment to renewable energies and sustainable development in Spain.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"59861\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2-1024x577.jpg\" alt=\"\" class=\"wp-image-59861\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2-1024x577.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2-300x169.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2-768x432.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2-1536x865.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-7-2.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"59855\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2-1024x577.jpg\" alt=\"\" class=\"wp-image-59855\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2-1024x577.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2-300x169.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2-768x432.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2-1536x865.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-1-2.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"59857\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2-1024x576.jpg\" alt=\"\" class=\"wp-image-59857\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2-1024x576.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2-300x169.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2-768x432.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2-1536x864.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-2-2.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"59859\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2-1024x768.jpg\" alt=\"\" class=\"wp-image-59859\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2-1536x1152.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-3-2.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"59853\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2-1024x576.jpg\" alt=\"\" class=\"wp-image-59853\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2-1024x576.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2-300x169.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2-768x432.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2-1536x864.jpg 1536w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/tabernas-III-8-2.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Eiffage Energ\u00eda Sistemas is to build the Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy. This project, with a capacity of 37.50 MW, will generate 76.61 GWh per year, contributing significantly to the production of renewable energy in the region, reaching some 21,000 homes and avoiding some 16,000 tonnes of CO2 emissions into &#8230; <a title=\"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda.\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/\" aria-label=\"Read more about Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda.\">Read more<\/a><\/p>\n","protected":false},"author":11,"featured_media":59869,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1941,1435],"tags":[2374,1949,1441,1443],"class_list":["post-60175","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-sistemas-en","category-renewable-energies","tag-aquila-clean-energy-en","tag-eiffage-energia-sistemas-en","tag-renewable-energies","tag-sostenibilidad-en-2"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New plant for Aquila Clean Energy in Almer\u00eda<\/title>\n<meta name=\"description\" content=\"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New plant for Aquila Clean Energy in Almer\u00eda\" \/>\n<meta property=\"og:description\" content=\"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-15T10:46:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-29T10:09:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1157\" \/>\n\t<meta property=\"og:image:height\" content=\"771\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Martinez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/\"},\"author\":{\"name\":\"Cristina Martinez\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/d4a1df7018b98e1c5037080a554ff67b\"},\"headline\":\"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda.\",\"datePublished\":\"2025-01-15T10:46:16+00:00\",\"dateModified\":\"2025-01-29T10:09:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/\"},\"wordCount\":485,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/fotovoltaica_tabernas.jpg\",\"keywords\":[\"Aquila Clean Energy\",\"Eiffage Energ\u00eda Sistemas\",\"Renewable Energies\",\"sostenibilidad\"],\"articleSection\":[\"Eiffage Energ\u00eda Sistemas\",\"Renewable Energies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/\",\"name\":\"New plant for Aquila Clean Energy in Almer\u00eda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/fotovoltaica_tabernas.jpg\",\"datePublished\":\"2025-01-15T10:46:16+00:00\",\"dateModified\":\"2025-01-29T10:09:31+00:00\",\"description\":\"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/fotovoltaica_tabernas.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/fotovoltaica_tabernas.jpg\",\"width\":1157,\"height\":771},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/01\\\/15\\\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/d4a1df7018b98e1c5037080a554ff67b\",\"name\":\"Cristina Martinez\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristinamartinez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New plant for Aquila Clean Energy in Almer\u00eda","description":"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/","og_locale":"en_US","og_type":"article","og_title":"New plant for Aquila Clean Energy in Almer\u00eda","og_description":"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2025-01-15T10:46:16+00:00","article_modified_time":"2025-01-29T10:09:31+00:00","og_image":[{"width":1157,"height":771,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg","type":"image\/jpeg"}],"author":"Cristina Martinez","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/"},"author":{"name":"Cristina Martinez","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/d4a1df7018b98e1c5037080a554ff67b"},"headline":"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda.","datePublished":"2025-01-15T10:46:16+00:00","dateModified":"2025-01-29T10:09:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/"},"wordCount":485,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg","keywords":["Aquila Clean Energy","Eiffage Energ\u00eda Sistemas","Renewable Energies","sostenibilidad"],"articleSection":["Eiffage Energ\u00eda Sistemas","Renewable Energies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/","name":"New plant for Aquila Clean Energy in Almer\u00eda","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg","datePublished":"2025-01-15T10:46:16+00:00","dateModified":"2025-01-29T10:09:31+00:00","description":"Aquila Clean Energy. Eiffage Energ\u00eda Sistemas will build the 37 MW Tabernas III photovoltaic plant in Almer\u00eda for Aquila Clean Energy.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/01\/fotovoltaica_tabernas.jpg","width":1157,"height":771},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/01\/15\/eiffage-energia-sistemas-to-build-new-photovoltaic-plant-for-aquila-clean-energy-in-tabernas-almeria\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Eiffage Energ\u00eda Sistemas to build new photovoltaic plant for Aquila Clean Energy in Tabernas Almer\u00eda."}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/d4a1df7018b98e1c5037080a554ff67b","name":"Cristina Martinez","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristinamartinez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/60175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=60175"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/60175\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/59869"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=60175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=60175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=60175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}