{"id":61509,"date":"2025-04-03T09:01:20","date_gmt":"2025-04-03T07:01:20","guid":{"rendered":"https:\/\/www.eiffageenergiasistemas.com\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/"},"modified":"2025-04-04T09:30:13","modified_gmt":"2025-04-04T07:30:13","slug":"cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada","status":"publish","type":"post","link":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/","title":{"rendered":"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Cubillas Photovoltaic Solar Plant<\/strong>, built by <a href=\"https:\/\/www.linkedin.com\/company\/eiffageenergiasistemas\/\">Eiffage Energ\u00eda Sistemas<\/a> for <a href=\"https:\/\/www.x-elio.com\/es\/\">X-Elio<\/a>, has commenced operations. It is situated next to the reservoir of the same name, in Albolote, 20 km from Granada.<\/p>\n\n<p class=\"wp-block-paragraph\">With a capacity of 35 MWp and an estimated output of 71,733 MWh\/year this plant will generate <strong>clean energy<\/strong> equivalent to the consumption of more than 20,000 homes.&#13;\n&#13;\nPresent at the opening ceremony were representatives of <strong>X-ELIO<\/strong>, local authorities and a team from <strong>Eiffage Energ\u00eda Sistemas<\/strong>, headed by Daniel Garrido Rubio, Internacional Director and Head of de Renewable Energies, together with Jos\u00e9 Ignacio Rodr\u00edguez Vera, Head of Solar and Windpower Construction.<\/p>\n\n<p class=\"wp-block-paragraph\">In his address, the CEO of X-ELIO, Fernando Lacaci, said that Cubillas Photovoltaic Solar Plant &#8220;is a clear example of our commitment to <strong>the energy transition in Andalusia<\/strong>.\u00a0 This project \u00a0demonstrates our approach to developing and building in a responsible manner, applying environmental best practices, techniques and safety, while at the same time ensuring it has a positive impact on the local community &#8220;.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Evacuation, O&amp;M<\/strong><\/h3>\n\n<p class=\"wp-block-paragraph\">This project also includes the<strong> evacuation infrastructure<\/strong>, guaranteeing the efficient connection of the energy generated to the grid.&#13;\n&#13;\nEiffage Energ\u00eda Sistemas will also handle the <strong>Operation and Maintenance<\/strong> (<strong>O&amp;M<\/strong>) of the plant for the next 20 years, ensuring its optimal performance and efficiency over time.&#13;\n&#13;\nA new project that reinforces our commitment to the energy transition and the development of <strong>sustainable infrastructure<\/strong>.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Other projects with X-ELIO<\/strong><\/h3>\n\n<p class=\"wp-block-paragraph\">Eiffage Energ\u00eda Sistemas has worked on the construction and O&amp;M of several wind farms, and their respective connection substations, developed by X-ELIO in southeastern Spain. Specifically, in the provinces of <strong>Albacete, Almeria and Murcia<\/strong>. These wind farms will be maintained by Eiffage Energ\u00eda for 20 years and will prevent the emission of 221,510 tonnes of CO<sub>2<\/sub> into the atmosphere per year.<\/p>\n\n<p class=\"wp-block-paragraph\">A major development is the Lorca Solar <strong>photovoltaic facility<\/strong>,\u00a0 with 369 MWp of installed power, located in Zarcilla de Ramos, in the municipality of Lorca, in the province of Murcia. A project that also includes the electrical energy evacuation system. and that will be operational in a few months.<\/p>\n\n<p class=\"wp-block-paragraph\">This plant will contribute during the first year by preventing the emission of around 148,328 tons of CO2 into the atmosphere. This project will also generate 748,000 MWh of 100% clean, sustainable energy during its first year and will supply the equivalent of 215,000 homes with annual consumption.<\/p>\n\n<p class=\"wp-block-paragraph\">It is also worth mentioning another X-Elio <strong>photovoltaic plant<\/strong> in the Valencian Community. It is <strong>Turroneros II,<\/strong> in Jijona, Alicante. The plant produces 65,325 MWh per year, preventing the emission of 42,460 tonnes of CO<sub>2<\/sub> per year and providing clean energy to more than 19,175 homes.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"61478\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-1-1024x768.jpg\" alt=\"\" class=\"wp-image-61478\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-1-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-1-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-1-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-1.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"61486\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-1B-1024x768.jpg\" alt=\"\" class=\"wp-image-61486\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-1B-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-1B-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-1B-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-1B.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"61481\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-3-1024x768.jpg\" alt=\"\" class=\"wp-image-61481\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-3-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-3-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-3-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-3.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"61474\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-7-768x1024.jpg\" alt=\"\" class=\"wp-image-61474\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-7-768x1024.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-7-225x300.jpg 225w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-7.jpg 810w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"61476\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-11-1024x768.jpg\" alt=\"\" class=\"wp-image-61476\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-11-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-11-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-11-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-11.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"576\" height=\"1024\" data-id=\"61484\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-15-576x1024.jpg\" alt=\"\" class=\"wp-image-61484\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-15-576x1024.jpg 576w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-15-169x300.jpg 169w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-15.jpg 608w\" sizes=\"(max-width: 576px) 100vw, 576px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"61480\" src=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-13-1024x768.jpg\" alt=\"\" class=\"wp-image-61480\" srcset=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-13-1024x768.jpg 1024w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-13-300x225.jpg 300w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-13-768x576.jpg 768w, https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/CUBILLAS-INAUGURACION-13.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cubillas Photovoltaic Solar Plant, built by Eiffage Energ\u00eda Sistemas for X-Elio, has commenced operations. It is situated next to the reservoir of the same name, in Albolote, 20 km from Granada. With a capacity of 35 MWp and an estimated output of 71,733 MWh\/year this plant will generate clean energy equivalent to the consumption of &#8230; <a title=\"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada\" class=\"read-more\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/\" aria-label=\"Read more about Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada\">Read more<\/a><\/p>\n","protected":false},"author":11,"featured_media":61473,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1941,1435],"tags":[2011,2407,1485,2408,1441,2131],"class_list":["post-61509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eiffage-energia-sistemas-en","category-renewable-energies","tag-andalucia-en","tag-csf-cubillas-en","tag-energia-solar-en-2","tag-granada-en","tag-renewable-energies","tag-x-elio-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Launching of the CSF Cubillas in Granada<\/title>\n<meta name=\"description\" content=\"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Launching of the CSF Cubillas in Granada\" \/>\n<meta property=\"og:description\" content=\"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/\" \/>\n<meta property=\"og:site_name\" content=\"Eiffage Energ\u00eda Sistemas\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-03T07:01:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-04T07:30:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"770\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Martinez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/\"},\"author\":{\"name\":\"Cristina Martinez\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/d4a1df7018b98e1c5037080a554ff67b\"},\"headline\":\"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada\",\"datePublished\":\"2025-04-03T07:01:20+00:00\",\"dateModified\":\"2025-04-04T07:30:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/\"},\"wordCount\":451,\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/PSFV-Cubillas.jpg\",\"keywords\":[\"Andaluc\u00eda\",\"CSF Cubillas\",\"Energ\u00eda Solar\",\"Granada\",\"Renewable Energies\",\"X-Elio\"],\"articleSection\":[\"Eiffage Energ\u00eda Sistemas\",\"Renewable Energies\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/\",\"name\":\"Launching of the CSF Cubillas in Granada\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/PSFV-Cubillas.jpg\",\"datePublished\":\"2025-04-03T07:01:20+00:00\",\"dateModified\":\"2025-04-04T07:30:13+00:00\",\"description\":\"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/PSFV-Cubillas.jpg\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/PSFV-Cubillas.jpg\",\"width\":1200,\"height\":770},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/2025\\\/04\\\/03\\\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#organization\",\"name\":\"Eiffage Energ\u00eda Sistemas\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"contentUrl\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/cropped-cropped-eiffage-energia-sistemas-logo-1.png\",\"width\":741,\"height\":250,\"caption\":\"Eiffage Energ\u00eda Sistemas\"},\"image\":{\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/#\\\/schema\\\/person\\\/d4a1df7018b98e1c5037080a554ff67b\",\"name\":\"Cristina Martinez\",\"url\":\"https:\\\/\\\/www.eiffageenergiasistemas.com\\\/en\\\/author\\\/cristinamartinez\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Launching of the CSF Cubillas in Granada","description":"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/","og_locale":"en_US","og_type":"article","og_title":"Launching of the CSF Cubillas in Granada","og_description":"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.","og_url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/","og_site_name":"Eiffage Energ\u00eda Sistemas","article_published_time":"2025-04-03T07:01:20+00:00","article_modified_time":"2025-04-04T07:30:13+00:00","og_image":[{"width":1200,"height":770,"url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg","type":"image\/jpeg"}],"author":"Cristina Martinez","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#article","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/"},"author":{"name":"Cristina Martinez","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/d4a1df7018b98e1c5037080a554ff67b"},"headline":"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada","datePublished":"2025-04-03T07:01:20+00:00","dateModified":"2025-04-04T07:30:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/"},"wordCount":451,"publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg","keywords":["Andaluc\u00eda","CSF Cubillas","Energ\u00eda Solar","Granada","Renewable Energies","X-Elio"],"articleSection":["Eiffage Energ\u00eda Sistemas","Renewable Energies"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/","name":"Launching of the CSF Cubillas in Granada","isPartOf":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#primaryimage"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg","datePublished":"2025-04-03T07:01:20+00:00","dateModified":"2025-04-04T07:30:13+00:00","description":"The Cubillas CSF, built by Eiffage Energ\u00eda Sistemas for X-Elio in Albolote, Granada, has been commissioned.","breadcrumb":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#primaryimage","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2025\/03\/PSFV-Cubillas.jpg","width":1200,"height":770},{"@type":"BreadcrumbList","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/2025\/04\/03\/cubillas-photovoltaic-solar-plant-is-opened-built-by-eiffage-energia-sistemas-for-x-elio-in-granada\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.eiffageenergiasistemas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Cubillas Photovoltaic Solar Plant is opened, built by Eiffage Energ\u00eda Sistemas for X-Elio in Granada"}]},{"@type":"WebSite","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#website","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","name":"Eiffage Energ\u00eda Sistemas","description":"","publisher":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.eiffageenergiasistemas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#organization","name":"Eiffage Energ\u00eda Sistemas","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","contentUrl":"https:\/\/www.eiffageenergiasistemas.com\/wp-content\/uploads\/2022\/05\/cropped-cropped-eiffage-energia-sistemas-logo-1.png","width":741,"height":250,"caption":"Eiffage Energ\u00eda Sistemas"},"image":{"@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.eiffageenergiasistemas.com\/en\/#\/schema\/person\/d4a1df7018b98e1c5037080a554ff67b","name":"Cristina Martinez","url":"https:\/\/www.eiffageenergiasistemas.com\/en\/author\/cristinamartinez\/"}]}},"_links":{"self":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/61509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/comments?post=61509"}],"version-history":[{"count":0,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/posts\/61509\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media\/61473"}],"wp:attachment":[{"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/media?parent=61509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/categories?post=61509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eiffageenergiasistemas.com\/en\/wp-json\/wp\/v2\/tags?post=61509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}