- Terminal Units: 18 air conditioning units for air handling and ventilation and 4 roof tops.
 - Trigeneration installation through exchange of combustion fumes.
 - Installations of Air conditioning and Energy metering systems. Medium-voltage electrical installation and Transformer Stations.
 - Control Electrical installation, Low Voltage Electrical Installation for air conditioning and trigeneration systems.
 - Civil works: Installation of acoustic treatments in mechanical rooms. Installation of gas and fire detection systems.
 - Installation of Centralised Technical Control and Management System with motor absorption and energy metering system integrations.
 - Electricity generation: 1 MW.
 - Heating through cogeneration/absorption: 530kW.
 - Trigeneration cooling through absorption. 946kW.
 - Power dissipation: 2,318kW.
 - A gas Cogeneration Motor of 1 MW of electricity generation.
 - Double effect absorption plant as water cooler and heater powered by exhaust gases.
 - Two power dissipation towers of the hybrid type with variable frequency drives.
 - Medium voltage room and sectioning centre with two 2,000 and 1.600 KVA transformers.
 - Pumps and hydraulic distributions with variable flow rate.
 - Distribution of hot and cold water to terminal units through a circuit with 4 pipes of pre-insulated pipelines.
 
Air conditioning and heating system in the Parque sur shopping centre in Madrid
									Business line: Installations								
				
									Subsidiary: Ambitec								
				Customer:
UNIBAIL-RODAMCO.
Budget:
€3,852,000.
Duration:
Beginning June 2010 and engine start-up January 2013.
Location:
Madrid (Spain).